Briefing on Gosford Solar Storage

Entity Briefing
Generated Oct 12, 2026·Dataset freshness not reported
305 MW
Proposed capacity
active
Current status
Solar
Technology
CAISO
Market / region
2029-03-30
Proposed COD
Cluster 15
Queue phase
Briefing/projectactive

Gosford Solar Storage is a 305 MW Solar project in California, currently active.

The reported queue phase is Cluster 15. Proposed COD is 2029-03-30.

Queue ID
CAISO-2313
Location
Kern, California
Technology
Solar
Market / region
CAISO
Point of interconnection
BITTERWATER SW STA 230 kV

What stands out

1

Gosford Solar Storage is a 305 MW Solar project in California with status active.

2

The reported queue phase is Cluster 15; proposed COD is 2029-03-30.

Market and operating context

Queue date
2023-04-17
Proposed COD
2029-03-30
IA status
Not Started
Study phase
Cluster 15
Service type
ERIS

Why it matters

Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.

Gosford Solar Storage — verified asset snapshot

FieldValue
Queue IDCAISO-2313
LocationKern, California
TechnologySolar
Market / regionCAISO
Point of interconnectionBITTERWATER SW STA 230 kV
Queue date2023-04-17
Proposed COD2029-03-30
IA statusNot Started