Lagoonez (CAISO-2294) — Project Summary

Queue ID
CAISO-2294
Capacity
1029 MW
Technology
Battery
Status
active
Location
Los Angeles, CA
Region
CAISO
Developer
—
IA Status
Not Started

Lagoonez

CAISO-2294BetaActiveBatteryCAISOLBNL

1,029 MW storage in Los Angeles, CA · In queue since April 2023 · Proposed COD December 2028

BA: CISOISO/RTO: CAISONERC: WECCRC: RCW

1,029 MW

Capacity

1

Components

Battery

3y 7m

In Queue

Not Started

IA Phase

COD target: 2028

Asset Intelligence Map

One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.

5 live dimensions
4 decision models

Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.

Structured from the current asset record; empty data branches are omitted.Locked nodes are InfraSure decision models; no simulated values shown.
Interconnection

Total Duration

5y 8m

Study Phase

Cluster 15

In Study38%
Queue EntryApr 17, 2023

Interconnection request submitted to ISO/RTO

Cluster Study (Phase I/II)Current

CAISO uses cluster studies where projects are batched annually and studied together.

Typical: 36–48 months (IR to IA)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2028-12-31

Cross-source intelligence

Saved research · Beta
Researched Oct 25, 2026

Experimental assessment saved at the research date. See the queue record for reported project facts.

Research COD
Dec 31, 2028
From queue filing
Developer in saved assessment
—
Status at research time
Active
Active in CAISO queue, interconnection agreement not started (IA status 'Not Started'); no public evidence of permitting, construction, or financing.
Financing
Not recorded
Research sources and reasoning (4 recorded sources)

low confidence at research time

  1. interconnection.fyi/projects/market/CAISO
  2. gridalmanac.com/queue/states/california/battery
  3. cleanview.co/power-projects/planned/battery-storage-projects/california/55004_storage/lagoonez
  4. infrasure.ai/project/caiso-2294-lagoonez

Commercial operation date: Only the LBNL queue date (2028-12-31) exists for this project. Aggregator listings such as Cleanview ('Expected online 2028') appear to mirror the queue data, so they are not independent confirmation. No developer press release or news article about Lagoonez was found.

Developer: The LBNL developer field is null, and no search result names a developer or operating company for Lagoonez. The news results are about unrelated lagoon or BESS projects.

Status: LBNL lists the project as active, and interconnection.fyi lists it as Active. GridAlmanac shows the IA as Not Started. No contradicting evidence was found.

About

Saved background

Generated Oct 25, 2026

Figures and claims below reflect the saved summary. See the queue record for reported project facts.

Lagoonez is a proposed battery energy storage development project located in Los Angeles County, California. The project has a total planned capacity of 1,029 MW, consisting entirely of a single battery storage component. No developer is identified in the available interconnection data. The project would connect to the transmission system at the Laguna Bell 230 kV substation, within the service territory of Southern California Edison (SCE).

The project is listed under queue ID CAISO-2294 in the California Independent System Operator (CAISO) interconnection queue, which it entered on April 17, 2023. It is participating in CAISO's Cluster 15 study process and has requested Network Resource Interconnection Service (NRIS). As of the latest data, the project's queue status is active, and negotiation of an interconnection agreement has not yet started. The proposed commercial operation date is December 31, 2028.

Summary provenance

Summary generated Oct 25, 2026 (UTC).

Source dates used by this summary were not recorded.

Dates in the current asset record

These may postdate the saved summary; they do not establish which inputs it used.

  • LBNL queue source as of: Dec 31, 2025.
Development Risk

Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Withdrawal probability vs cohort
IA cluster risk
Project Details

State

CA

County

Los Angeles

Grid Region

CAISO (California)

Market

ISO/RTO Member

Developer

—

Utility

SCE

Entity

CAISO

Service Type

NRIS

Point of Interconnection

LAGUNA BELL 230 kV

Data Source

LBNL

Risk Analytics

Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Generation Forecast

Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

P50 conditioned on COD
Capacity factor vs cohort
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

Revenue conditioned on COD
Financing close risk
Cohort DSCR comparison
Market Context
Approximate
ISO / RTO
CAISO
Trading Hub
TH_SP15_GEN-APND
Hub Confidence
MEDIUM
Nearest Node (Estimated)
LAGUBELL_6_N005
POI Substation
Laguna Bell Substation

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No insights available for this project.
InfraSure platform

Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.