Mesquite Solar 6 (CAISO-2279) — Project Summary

Queue ID
CAISO-2279
Capacity
308.98 MW
Technology
Solar+Battery
Status
active
Location
Maricopa, AZ
Region
CAISO
Developer
—
IA Status
Not Started

Mesquite Solar 6

CAISO-2279BetaActiveSolarBatteryCAISOLBNL

308.98 MW hybrid in Maricopa, AZ · In queue since April 2023 · Proposed COD April 2028

BA: AZPSISO/RTO: CAISONERC: WECCRC: SPPW

308.98 MW

Capacity

2

Components

Solar + Battery

3y 7m

In Queue

Not Started

IA Phase

COD target: 2028

Asset Intelligence Map

One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.

5 live dimensions
4 decision models

Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.

Structured from the current asset record; empty data branches are omitted.Locked nodes are InfraSure decision models; no simulated values shown.
Interconnection

Total Duration

5 years

Study Phase

Cluster 15

In Study38%
Queue EntryApr 17, 2023

Interconnection request submitted to ISO/RTO

Cluster Study (Phase I/II)Current

CAISO uses cluster studies where projects are batched annually and studied together.

Typical: 36–48 months (IR to IA)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2028-04-30

Cross-source intelligence

Saved research · Beta
Researched Oct 25, 2026

Experimental assessment saved at the research date. See the queue record for reported project facts.

Research COD
Apr 30, 2028
From queue filing
Developer in saved assessment
—
Status at research time
Active
Active in the CAISO queue (listed in the Cluster 15 interconnection requests); IA not started; planned solar+storage in Maricopa County, AZ, with no sign of construction.
Financing
Not recorded
Research sources and reasoning (5 recorded sources)

low confidence at research time

  1. cleanview.co/power-projects/planned/solar-farms/arizona/54942_photovoltaic/mesquite-solar-6
  2. cleanview.co/power-projects/planned/battery-storage-projects/arizona/54952_storage/mesquite-solar-6
  3. interconnection.fyi/project/caiso-54952
  4. americas.rwe.com/our-energy/solar-energy/solar-projects-and-locations/mesquite-solar-complex/
  5. caiso.com/Documents/Cluster-15-Interconnection-Requests.xlsx

Commercial operation date: LBNL proposed COD is 2028-04-30. Cleanview says 'Expected online 2028' and interconnection.fyi says 'proposed completion date is April 29, 2028'. Both appear to be aggregator data derived from the queue, not independent developer-backed targets, so no correction is warranted.

Developer: LBNL developer field is null and no result names a developer for Mesquite Solar 6. RWE's Mesquite Solar Complex page and Wikipedia cover the adjacent Mesquite phases, but neither names phase 6, so attributing it to RWE would be an inference.

Status: LBNL shows 'active' and the CAISO Cluster 15 request list includes Mesquite Solar 6. Aggregators describe the project as planned, and no source reports construction, an executed IA, or withdrawal.

About

Saved background

Generated Oct 25, 2026

Figures and claims below reflect the saved summary. See the queue record for reported project facts.

Mesquite Solar 6 is a proposed hybrid solar and battery storage development project in Maricopa County, Arizona, with a total capacity of 308.98 MW. The project pairs a 154.48 MW solar photovoltaic component with a 154.5 MW battery energy storage component. Although located in Arizona, the project is in the interconnection queue of the California Independent System Operator (CAISO) under queue ID CAISO-2279, with SDG&E (San Diego Gas & Electric) identified as the associated utility. It proposes to interconnect at the Hassayampa 500 kV point of interconnection and has requested Energy Resource Interconnection Service (ERIS).

The project entered the CAISO queue on April 17, 2023, and is being evaluated as part of the Cluster 15 study phase. Its queue status is active, and its proposed commercial operation date is April 30, 2028. As of the most recent data, work on an interconnection agreement had not yet started.

Summary provenance

Summary generated Oct 25, 2026 (UTC).

Source dates used by this summary were not recorded.

Dates in the current asset record

These may postdate the saved summary; they do not establish which inputs it used.

  • LBNL queue source as of: Dec 31, 2025.
Development Risk

Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Withdrawal probability vs cohort
IA cluster risk
Project Details

State

AZ

County

Maricopa

Grid Region

CAISO (California)

Market

ISO/RTO Member

Developer

—

Utility

SDGE

Entity

CAISO

Service Type

ERIS

Point of Interconnection

HASSAYAMPA 500 kV

Data Source

LBNL

Risk Analytics

Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Technology
Solar154.48 MW · 50%
Battery154.5 MW · 50%
Generation Forecast

Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

P50 conditioned on COD
Capacity factor vs cohort
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

Revenue conditioned on COD
Financing close risk
Cohort DSCR comparison
Market Context
Approximate
ISO / RTO
CAISO
Trading Hub
TH_SP15_GEN-APND
Hub Confidence
LOW

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No insights available for this project.
InfraSure platform

Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.