BOULDER BRUSH HYBRID
419.719 MW hybrid in San Diego, CA · In queue since April 2021 · Proposed COD February 2031
419.719 MW
Capacity
2
Components
Wind + Battery
5y 7m
In Queue
System Impact Study
IA Phase
COD target: 2031
One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.
Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.
Total Duration
9y 10m
Study Phase
C14
Interconnection request submitted to ISO/RTO
Active sheet; C14
CAISO uses cluster studies where projects are batched annually and studied together.
Typical: 36–48 months (IR to IA)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2031-02-05
Cross-source intelligence
Experimental assessment saved at the research date. See the queue record for reported project facts.
Research sources and reasoning (6 recorded sources)
low confidence at research time
- interconnection.fyi/project/caiso-2177
- infrasure.ai/project/caiso-2177-boulder-brush-hybrid
- cleanview.co/power-projects/planned/battery-storage-projects/california/2177_storage/boulder-brush-hybrid
- app.nrgmap.com/queues/caiso-2177
- sandiegouniontribune.com/2024/03/22/wind-project-in-san-diegos-backcountry-runs-into-turbulence/
- sandiegocounty.gov/content/sdc/pds/ceqa/BoulderBrush.html
Commercial operation date: The only COD signal is the LBNL/CAISO proposed COD of 2031-02-05. The aggregator pages (Infrasure, Cleanview 'Expected online 2031') repeat the queue data and add no independent developer-backed date.
Developer: LBNL lists no developer. The search results do not name an operating company for the queue entry. The Campo Wind / Boulder Brush CEQA documents describe a similarly named project, but the excerpts do not name a developer or confirm it is the same project as CAISO-2177.
Status: LBNL and the aggregators (interconnection.fyi, NRG Map) all show the queue position as active. The San Diego Union-Tribune reported that the related wind project's fate was 'up in the air' after a court granted an appeal. That link to CAISO-2177 is inferred from the name, so it does not change the status.
About
Generated Apr 10, 2026 · Predates Oct 24, 2026 queue source
Figures and claims below reflect the saved summary. See the queue record for reported project facts.
The Boulder Brush Hybrid project is a proposed wind and battery energy storage development with a total capacity of 419.72 MW, located in San Diego County, California. The project consists of 105.8 MW of wind generation capacity and 313.92 MW of battery energy storage. It is being developed within the California Independent System Operator (CAISO) region and has interconnection queue ID CAISO-2177.
The project entered the CAISO interconnection queue on April 15, 2021, and has a proposed commercial operation date of February 5, 2031. Its interconnection status is currently in the System Impact Study phase. The point of interconnection is the Suncrest - Ocotillo 500 kV Line, and the interconnecting utility is San Diego Gas & Electric (SDGE). The Boulder Brush Hybrid project has appeared in recent news coverage.
Summary provenance
Summary generated Apr 10, 2026 (UTC).
Source dates used by this summary were not recorded.
Dates in the current asset record
These may postdate the saved summary; they do not establish which inputs it used.
- CAISO queue source as of: Oct 24, 2026.
Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.
See the full development-risk decomposition for this project.
State
CA
County
San Diego
Grid Region
CAISO (California)
Market
ISO/RTO Member
Developer
—
Utility
SDGE
Entity
CAISO
Service Type
NRIS
Point of Interconnection
Suncrest - Ocotillo 500 kV Line
Data Source
LBNL + Live
Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.
See the full risk decomposition + scenarios for this project.
Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this project.
Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this project.
- ISO / RTO
- CAISO
- Trading Hub
- TH_SP15_GEN-APND
- Hub Confidence
- LOW
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
Max 4 Wind
Data tables and metrics from the InfraSure database.
FPL Energy Oliver Wind II LLC
Cross-dimensional entity briefing with KPIs, news intelligence, and fleet analysis.
FPL Energy Oliver Wind I LLC
Cross-dimensional entity briefing with KPIs, news intelligence, and fleet analysis.
GL Wind
Cross-dimensional entity briefing with KPIs, news intelligence, and fleet analysis.
Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.