LARREA SOLAR
614 MW hybrid in Clark, NV · In queue since April 2021 · Proposed COD September 2028
614 MW
Capacity
2
Components
Solar + Battery
5y 7m
In Queue
System Impact Study
IA Phase
COD target: 2028
One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.
Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.
Total Duration
7y 5m
Study Phase
C14
Interconnection request submitted to ISO/RTO
Active sheet; C14
CAISO uses cluster studies where projects are batched annually and studied together.
Typical: 36–48 months (IR to IA)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2028-09-15
Cross-source intelligence
Experimental assessment saved at the research date. See the queue record for reported project facts.
Research sources and reasoning (4 recorded sources)
low confidence at research time
- blm.gov/sites/default/files/docs/2024-10/BLM_NV_SNDO_Larrea-Solar-Project-Fact-Sheet.pdf
- permits.performance.gov/permitting-project/fast-41-covered-projects/larrea-solar-project
- cleanview.co/power-projects/planned/solar-farms/nevada/2150_photovoltaic/larrea-solar
- infrasure.ai/project/caiso-2150-larrea-solar
Commercial operation date: LBNL lists a proposed COD of 2028-09-15, and Cleanview says 'Expected online 2028'. Cleanview is probably derived from the queue data, so no independent developer-issued COD was found. The project is still in permitting, which is consistent with 2028.
Developer: The LBNL developer field is blank, so there is nothing to compare against. The BLM fact sheet names 'Nuturgy [Naturgy] Candela Devco' as the proponent of the Larrea Solar Project. This is a single 2024 source, and no parent or shell-LLC relationship could be confirmed.
Status: LBNL shows 'active' with no IA date. The BLM and FAST-41 permitting records and the aggregator listings show the project is still being developed, with no sign of withdrawal or construction start.
About
Generated Apr 10, 2026 · Predates Oct 24, 2026 queue source
Figures and claims below reflect the saved summary. See the queue record for reported project facts.
The ROUGH HAT 3 development project is a proposed 614 MW hybrid solar and battery energy storage system located in Clark County, Nevada. The project consists of 307 MW of solar photovoltaic generation paired with 307 MW of battery storage. It is listed in the California Independent System Operator (CAISO) interconnection queue under queue ID CAISO-2150.
The project entered the CAISO queue on April 15, 2021, and has a proposed commercial operation date of September 15, 2028. Its interconnection status is currently in the System Impact Study phase. The point of interconnection is the Trout Canyon Substation at 230 kV. Recent news coverage has discussed the project.
Summary provenance
Summary generated Apr 10, 2026 (UTC).
Source dates used by this summary were not recorded.
Dates in the current asset record
These may postdate the saved summary; they do not establish which inputs it used.
- CAISO queue source as of: Oct 24, 2026.
Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.
See the full development-risk decomposition for this project.
State
NV
County
Clark
Grid Region
CAISO (California)
Market
ISO/RTO Member
Developer
—
Utility
GLW
Entity
CAISO
Service Type
NRIS
Point of Interconnection
Trout Canyon Substation 230 kV
Data Source
LBNL + Live
Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.
See the full risk decomposition + scenarios for this project.
Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this project.
Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this project.
- ISO / RTO
- CAISO
- Trading Hub
- TH_ZP26_GEN-APND
- Hub Confidence
- LOW
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
Solar queue pipeline by status
Data tables and metrics from the InfraSure database.
Geothermal queue pipeline overview
Summary analysis with parallel narrative sections and visualizations.
Battery Storage queue pipeline by status
Data tables and metrics from the InfraSure database.
AEP Jacksonville Solar Project
Cross-dimensional entity briefing with KPIs, news intelligence, and fleet analysis.
Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.