DANDELION HYBRID SOLAR
334.2 MW hybrid in Nye, NV · In queue since April 2021 · Proposed COD December 2027
334.2 MW
Capacity
2
Components
Solar + Battery
5y 3m
In Queue
System Impact Study
IA Phase
COD target: 2027
Total Duration
6y 8m
Study Phase
C14
Interconnection request submitted to ISO/RTO
CAISO uses cluster studies where projects are batched annually and studied together.
Typical: 36–48 months (IR to IA)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2027-12-26
Queue position 2145 entered CAISO interconnection queue April 2021
sourceThe DANDELION HYBRID SOLAR project is a proposed 334.2 MW hybrid solar and battery energy storage development in Nye County, Nevada. The project consists of a 223.33 MW solar photovoltaic array coupled with a 110.87 MW battery energy storage system. It is located within the California Independent System Operator (CAISO) region and is interconnected to the Vista Substation at 230 kV.
The project, identified as queue ID CAISO-2145, entered the CAISO interconnection queue on April 15, 2021. Its proposed commercial operation date is December 26, 2027. As of the latest data, the project's interconnection status is in the System Impact Study phase. The identified utility for the project is GLW. The DANDELION HYBRID SOLAR project has appeared in recent news coverage.
Generated from interconnection queue and public data sources
Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.
See the full development-risk decomposition for this project.
State
NV
County
Nye
Grid Region
CAISO (California)
Market
ISO/RTO Member
Developer
—
Utility
GLW
Entity
CAISO
Service Type
NRIS
Point of Interconnection
Vista Substation 230 kV
Data Source
LBNL + Live
Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.
See the full risk decomposition + scenarios for this project.
Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this project.
Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this project.
- ISO / RTO
- CAISO
- Trading Hub
- TH_ZP26_GEN-APND
- Hub Confidence
- MEDIUM
- Nearest Node (Estimated)
- STELLING_1_N007
- POI Substation
- Monta Vista Substation
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
No Ask reports yet for this entity.
Ask about DANDELION HYBRID SOLARForward forecasts, scenario decomposition, and risk-decision tooling for this queue project.