Query
DANDELION HYBRID SOLAR
Type
Entity Briefing
Entity
DANDELION HYBRID SOLAR
Technology
solar
Generated
2026-10-11T11:43:34.689Z

Briefing on DANDELION HYBRID SOLAR

Entity Briefing
Generated Oct 11, 2026·Dataset freshness not reported
334 MW
Proposed capacity
active
Current status
Solar+Battery
Technology
CAISO
Market / region
2027-12-26
Proposed COD
C14
Queue phase
Briefing/projectactive

DANDELION HYBRID SOLAR is a 334 MW Solar+Battery project in Nevada, currently active.

The reported queue phase is C14. Proposed COD is 2027-12-26.

Queue ID
CAISO-2145
Location
Nye, Nevada
Technology
Solar+Battery
Market / region
CAISO
Point of interconnection
Vista Substation 230 kV

What stands out

1

DANDELION HYBRID SOLAR is a 334 MW Solar+Battery project in Nevada with status active.

2

The reported queue phase is C14; proposed COD is 2027-12-26.

Market and operating context

Queue date
2021-04-15
Proposed COD
2027-12-26
IA status
System Impact Study
Study phase
C14
Service type
NRIS

Why it matters

Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.

DANDELION HYBRID SOLAR — verified asset snapshot

FieldValue
Queue IDCAISO-2145
LocationNye, Nevada
TechnologySolar+Battery
Market / regionCAISO
Point of interconnectionVista Substation 230 kV
Queue date2021-04-15
Proposed COD2027-12-26
IA statusSystem Impact Study