ROCK VALLEY ENERGY CENTER (CAISO-2144) — Project Summary

Queue ID
CAISO-2144
Capacity
1023.64 MW
Technology
Solar+Battery
Status
active
Location
Nye, NV
Region
CAISO
Developer
—
IA Status
IA Executed

ROCK VALLEY ENERGY CENTER

CAISO-2144BetaActiveSolarBatteryCAISOLBNL + Live

1,023.64 MW hybrid in Nye, NV · In queue since April 2021 · Proposed COD March 2029

BA: NEVPISO/RTO: CAISONERC: WECCRC: SPPW

1,023.64 MW

Capacity

2

Components

Solar + Battery

5y 7m

In Queue

IA Executed

IA Phase

Signed Dec 2024

Asset Intelligence Map

One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.

5 live dimensions
4 decision models

Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.

Structured from the current asset record; empty data branches are omitted.Locked nodes are InfraSure decision models; no simulated values shown.
Interconnection

Queue → IA

3y 8m

IA → COD

4y 3m

Total Duration

3y 8m

Study Phase

C14

Construction75%
Queue EntryApr 15, 2021

Interconnection request submitted to ISO/RTO

Cluster Study (Phase I/II)

CAISO uses cluster studies where projects are batched annually and studied together.

Typical: 36–48 months (IR to IA)

Interconnection AgreementDec 27, 2024

Interconnection agreement executed — binding commitment to build

Typical: 30–60 days (negotiation)

ConstructionCurrent

Active sheet; IA Executed; C14

Project under construction

Typical: 18–30 months

Commercial Operation

Proposed COD: 2029-03-15

Cross-source intelligence

Saved research · Beta
Researched Oct 25, 2026

Experimental assessment saved at the research date. See the queue record for reported project facts.

Research COD
Mar 15, 2029
From queue filing
Developer in saved assessment
—
Status at research time
IA Executed
Active, IA executed 2024-12-27. The project is on BLM land in Nye County and is still pre-NEPA/permitting. It was cleared to resume federal review in Feb 2026 after an administrative pause.
Financing
Not recorded
Research sources and reasoning (4 recorded sources)

low confidence at research time

  1. basinandrangewatch2.org/solar-projects/rock-valley-solar
  2. blm.gov/sites/default/files/docs/2024-10/BLM_NV_SNDO_Rock-Valley-Energy-Center-Project-Fact-Sheet.pdf
  3. cleanview.co/power-projects/planned/solar-farms/nevada/2144_photovoltaic/rock-valley-energy-center
  4. infrasure.ai/project/caiso-2144-rock-valley-energy-center

Commercial operation date: Only the LBNL proposed COD (2029-03-15) is available. Cleanview's 'Expected online 2029' matches it but is probably derived from the queue data, so it is not independent. BLM NEPA review was still pending as of Feb 2026 ('environmental review under NEPA and permitting are coming very soon'), so 2029 may be optimistic.

Developer: The LBNL developer field is null, and none of the search snippets name the applicant or operating company. The BLM documents likely name the applicant, but the snippets do not show it.

Status: LBNL shows an active queue entry with an executed IA. Basin and Range Watch (Feb 27, 2026) reports the project cleared Interior administrative review and is 'back on track' for BLM environmental review. It is not yet permitted or under construction.

About

Saved background

Generated Apr 10, 2026 · Predates Oct 24, 2026 queue source

Figures and claims below reflect the saved summary. See the queue record for reported project facts.

The Rock Valley Energy Center is a proposed hybrid solar and battery project located in Nye County, Nevada. The development project has a total capacity of 1023.64 MW, consisting of 508.56 MW of solar generation and 515.08 MW of battery energy storage.

The project is in the California Independent System Operator (CAISO) interconnection queue as queue ID CAISO-2144, with an entry date of April 15, 2021. The proposed commercial operation date is March 15, 2029, and the Interconnection Agreement (IA) has been executed. The point of interconnection is the Beatty Substation at 230 kV.

Summary provenance

Summary generated Apr 10, 2026 (UTC).

Source dates used by this summary were not recorded.

Dates in the current asset record

These may postdate the saved summary; they do not establish which inputs it used.

  • CAISO queue source as of: Oct 24, 2026.
Development Risk

Realization risk from now to commercial operation — financing close, EPC and tax-equity counterparty mix, and COD probability vs the proposed date. The diligence view that determines whether the deal actually closes. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Financing close probability
EPC + tax-equity counterparty
Project Details

State

NV

County

Nye

Grid Region

CAISO (California)

Market

ISO/RTO Member

Developer

—

Utility

GLW

Entity

CAISO

Service Type

ERIS

Point of Interconnection

Beatty Substation 230 kV

Data Source

LBNL + Live

Risk Analytics

Composite operating-phase risk view — what this asset's risk profile will look like once it commissions. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Technology
Solar508.56 MW · 50%
Battery515.08 MW · 50%
Generation Forecast

Forward generation outlook — first-year production estimate and 10-year P50 trajectory, with probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

10-year P50 forecast
First-year output estimate
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. First-year DSCR, 10-year cashflow, and counterparty exposure across price and policy scenarios. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

10-year revenue projection
First-year DSCR
Financing close risk
Market Context
Approximate
ISO / RTO
CAISO
Trading Hub
TH_NP15_GEN-APND
Hub Confidence
LOW

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No insights available for this project.
InfraSure platform

Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.