ROCK VALLEY ENERGY CENTER
1,023.64 MW hybrid in Nye, NV · In queue since April 2021 · Proposed COD March 2029
1,023.64 MW
Capacity
2
Components
Solar + Battery
5y 7m
In Queue
IA Executed
IA Phase
Signed Dec 2024
One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.
Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.
Queue → IA
3y 8m
IA → COD
4y 3m
Total Duration
3y 8m
Study Phase
C14
Interconnection request submitted to ISO/RTO
CAISO uses cluster studies where projects are batched annually and studied together.
Typical: 36–48 months (IR to IA)
Interconnection agreement executed — binding commitment to build
Typical: 30–60 days (negotiation)
Active sheet; IA Executed; C14
Project under construction
Typical: 18–30 months
Proposed COD: 2029-03-15
Cross-source intelligence
Experimental assessment saved at the research date. See the queue record for reported project facts.
Research sources and reasoning (4 recorded sources)
low confidence at research time
- basinandrangewatch2.org/solar-projects/rock-valley-solar
- blm.gov/sites/default/files/docs/2024-10/BLM_NV_SNDO_Rock-Valley-Energy-Center-Project-Fact-Sheet.pdf
- cleanview.co/power-projects/planned/solar-farms/nevada/2144_photovoltaic/rock-valley-energy-center
- infrasure.ai/project/caiso-2144-rock-valley-energy-center
Commercial operation date: Only the LBNL proposed COD (2029-03-15) is available. Cleanview's 'Expected online 2029' matches it but is probably derived from the queue data, so it is not independent. BLM NEPA review was still pending as of Feb 2026 ('environmental review under NEPA and permitting are coming very soon'), so 2029 may be optimistic.
Developer: The LBNL developer field is null, and none of the search snippets name the applicant or operating company. The BLM documents likely name the applicant, but the snippets do not show it.
Status: LBNL shows an active queue entry with an executed IA. Basin and Range Watch (Feb 27, 2026) reports the project cleared Interior administrative review and is 'back on track' for BLM environmental review. It is not yet permitted or under construction.
About
Generated Apr 10, 2026 · Predates Oct 24, 2026 queue source
Figures and claims below reflect the saved summary. See the queue record for reported project facts.
The Rock Valley Energy Center is a proposed hybrid solar and battery project located in Nye County, Nevada. The development project has a total capacity of 1023.64 MW, consisting of 508.56 MW of solar generation and 515.08 MW of battery energy storage.
The project is in the California Independent System Operator (CAISO) interconnection queue as queue ID CAISO-2144, with an entry date of April 15, 2021. The proposed commercial operation date is March 15, 2029, and the Interconnection Agreement (IA) has been executed. The point of interconnection is the Beatty Substation at 230 kV.
Summary provenance
Summary generated Apr 10, 2026 (UTC).
Source dates used by this summary were not recorded.
Dates in the current asset record
These may postdate the saved summary; they do not establish which inputs it used.
- CAISO queue source as of: Oct 24, 2026.
Realization risk from now to commercial operation — financing close, EPC and tax-equity counterparty mix, and COD probability vs the proposed date. The diligence view that determines whether the deal actually closes. Powered by InfraSure's development-stage modeling stack.
See the full development-risk decomposition for this project.
State
NV
County
Nye
Grid Region
CAISO (California)
Market
ISO/RTO Member
Developer
—
Utility
GLW
Entity
CAISO
Service Type
ERIS
Point of Interconnection
Beatty Substation 230 kV
Data Source
LBNL + Live
Composite operating-phase risk view — what this asset's risk profile will look like once it commissions. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.
See the full risk decomposition + scenarios for this project.
Forward generation outlook — first-year production estimate and 10-year P50 trajectory, with probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this project.
Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. First-year DSCR, 10-year cashflow, and counterparty exposure across price and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this project.
- ISO / RTO
- CAISO
- Trading Hub
- TH_NP15_GEN-APND
- Hub Confidence
- LOW
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
Solar queue pipeline by status
Data tables and metrics from the InfraSure database.
Geothermal queue pipeline overview
Summary analysis with parallel narrative sections and visualizations.
Battery Storage queue pipeline by status
Data tables and metrics from the InfraSure database.
AEP Jacksonville Solar Project
Cross-dimensional entity briefing with KPIs, news intelligence, and fleet analysis.
Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.