DELAMAR ENERGY STORAGE 2
256.29 MW storage in Clark, NV · In queue since April 2021 · Proposed COD June 2030
256.29 MW
Capacity
1
Components
Battery
5y 7m
In Queue
System Impact Study
IA Phase
COD target: 2030
One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.
Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.
Total Duration
9y 2m
Study Phase
C14
Interconnection request submitted to ISO/RTO
Active sheet; C14
CAISO uses cluster studies where projects are batched annually and studied together.
Typical: 36–48 months (IR to IA)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2030-06-26
Cross-source intelligence
Experimental assessment saved at the research date. Predates the Oct 24, 2026 queue source. Research and queue COD differ; this comparison does not confirm either date. See the queue record for reported project facts.
Milestones in this assessment
Proposed commercial operation date per CAISO queue filing
cleanview.coResearch sources and reasoning (4 recorded sources)
low confidence at research time
- cleanview.co/power-projects/planned/battery-storage-projects/nevada/1796_storage/delamar-energy-storage
- cleanview.co/power-projects/developers/rev-renewables
- cleanview.co/planned-battery-projects/NV/2141_storage/delamar-energy-storage-2
- caiso.com/documents/publicqueuereport.xlsx
Commercial operation date: LBNL queue snapshot shows proposed COD of 2027-06-26. No independent news sources or press releases found to confirm or contradict this date. Cleanview aggregator sites echo the June 2027 date but appear to derive from LBNL data.
Developer: Cleanview database explicitly attributes this project to REV Renewables as the developer. LBNL snapshot shows null developer field, so no shell-LLC vs parent conflict exists.
Status: LBNL shows 'active' status with 'System Impact Study' interconnection phase. No news of withdrawal, suspension, or advancement to construction found in search results.
About
Generated Apr 10, 2026 · Predates Oct 24, 2026 queue source
Figures and claims below reflect the saved summary. See the queue record for reported project facts.
The proposed DELAMAR ENERGY STORAGE 2 project is a 256.29 MW battery storage development in Clark County, Nevada. It is located within the California Independent System Operator (CAISO) region and is interconnected to the SCE portion of Eldorado Substation at 230 kV. The project entered the CAISO queue as queue ID CAISO-2141 on April 15, 2021.
The project's interconnection status is currently in the System Impact Study phase, with a proposed commercial operation date of June 26, 2027. Recent news coverage has discussed the project.
Summary provenance
Summary generated Apr 10, 2026 (UTC).
Source dates used by this summary were not recorded.
Dates in the current asset record
These may postdate the saved summary; they do not establish which inputs it used.
- CAISO queue source as of: Oct 24, 2026.
Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.
See the full development-risk decomposition for this project.
State
NV
County
Clark
Grid Region
CAISO (California)
Market
ISO/RTO Member
Developer
—
Utility
SCE
Entity
CAISO
Service Type
NRIS
Point of Interconnection
SCE portion of Eldorado Substation 230 kV
Data Source
LBNL + Live
Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.
See the full risk decomposition + scenarios for this project.
Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this project.
Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this project.
- ISO / RTO
- CAISO
- Trading Hub
- TH_ZP26_GEN-APND
- Hub Confidence
- LOW
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
Battery storage queue pipeline
Summary analysis with parallel narrative sections and visualizations.
Battery Storage queue pipeline overview
Summary analysis with parallel narrative sections and visualizations.
Nevada
Cross-dimensional entity briefing with KPIs, news intelligence, and fleet analysis.
DELAMAR ENERGY STORAGE 2
Data-driven briefing on DELAMAR ENERGY STORAGE 2 — fleet, generation, financial, and news signals.
Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.