Briefing on DELAMAR ENERGY STORAGE 2

Entity Briefing
Generated Oct 11, 2026·Dataset freshness not reported
256 MW
Proposed capacity
active
Current status
Battery
Technology
CAISO
Market / region
2027-06-26
Proposed COD
C14
Queue phase
Briefing/projectactive

DELAMAR ENERGY STORAGE 2 is a 256 MW Battery project in Nevada, currently active.

The reported queue phase is C14. Proposed COD is 2027-06-26.

Queue ID
CAISO-2141
Location
Clark, Nevada
Technology
Battery
Market / region
CAISO
Point of interconnection
SCE portion of Eldorado Substation 230 kV

What stands out

1

DELAMAR ENERGY STORAGE 2 is a 256 MW Battery project in Nevada with status active.

2

The reported queue phase is C14; proposed COD is 2027-06-26.

Market and operating context

Queue date
2021-04-15
Proposed COD
2027-06-26
IA status
System Impact Study
Study phase
C14
Service type
NRIS

Why it matters

Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.

DELAMAR ENERGY STORAGE 2 — verified asset snapshot

FieldValue
Queue IDCAISO-2141
LocationClark, Nevada
TechnologyBattery
Market / regionCAISO
Point of interconnectionSCE portion of Eldorado Substation 230 kV
Queue date2021-04-15
Proposed COD2027-06-26
IA statusSystem Impact Study