CONDUIT ENERGY STORAGE (CAISO-2105) — Project Summary

Queue ID
CAISO-2105
Capacity
512.58 MW
Technology
Battery
Status
active
Location
San Bernardino, CA
Region
CAISO
Developer
—
IA Status
IA Executed

CONDUIT ENERGY STORAGE

CAISO-2105BetaActiveBatteryCAISOLBNL + Live

512.58 MW storage in San Bernardino, CA · In queue since April 2021 · Proposed COD February 2031

BA: CISOISO/RTO: CAISONERC: WECCRC: RCW

512.58 MW

Capacity

1

Components

Battery

5y 7m

In Queue

IA Executed

IA Phase

Signed Oct 2025

Asset Intelligence Map

One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.

5 live dimensions
4 decision models

Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.

Structured from the current asset record; empty data branches are omitted.Locked nodes are InfraSure decision models; no simulated values shown.
Interconnection

Queue → IA

4y 6m

IA → COD

5y 4m

Total Duration

4y 6m

Study Phase

C14

Construction75%
Queue EntryApr 15, 2021

Interconnection request submitted to ISO/RTO

Cluster Study (Phase I/II)

CAISO uses cluster studies where projects are batched annually and studied together.

Typical: 36–48 months (IR to IA)

Interconnection AgreementOct 6, 2025

Interconnection agreement executed — binding commitment to build

Typical: 30–60 days (negotiation)

ConstructionCurrent

Active sheet; IA Executed; C14

Project under construction

Typical: 6–18 months

Commercial Operation

Proposed COD: 2031-02-26

News-reported activity

From dated articles. These observations may describe earlier stages or other project phases; see the queue record above for reported filing status.

Latest milestoneCOD achieved · 2024-10-01Energy-Storage.News · 2025-09-04

Cross-source intelligence

Saved research · Beta
Researched Oct 25, 2026

Experimental assessment saved at the research date. See the queue record for reported project facts.

Research COD
Feb 26, 2031
From queue filing
Developer in saved assessment
—
Status at research time
IA Executed
Active in the CAISO queue with an IA executed 2025-10-06. Planned ~500 MW / 4,000 MWh BESS near Hesperia, interconnecting at SCE Lugo 500 kV. It is listed as planned, with no construction signal.
Financing
Not recorded
Research sources and reasoning (4 recorded sources)

low confidence at research time

  1. wecc.org/sites/default/files/documents/progress_report/2026/Conduit%20ES%202026%20APR.pdf
  2. interconnection.fyi/project/caiso-2105
  3. cleanview.co/power-projects/planned/battery-storage-projects/california/2105_storage/conduit-energy-storage
  4. infrasure.ai/project/caiso-2105-conduit-energy-storage

Commercial operation date: Only the LBNL proposed COD of 2031-02-26 exists. The aggregator pages (interconnection.fyi, Cleanview) repeat the same date and are not independent. No developer press release or news item gives a different financing-backed target.

Developer: The LBNL developer field is null. The WECC 2026 progress report names the project entity as Conduit Energy Storage, LLC but not a parent or operating company. The news-extracted developer (Ormat Technologies, Lower Rio, Texas) comes from an unrelated Texas BESS article and was not used. The North Dakota NextEra item is also unrelated.

Status: LBNL shows status active with an executed IA dated 2025-10-06. The WECC progress report from Feb 2026 and the aggregator listings show the project as still planned and not operational.

Project lifecycle
as of 2024-10-02
OperationalNoCalexico Chronicle · 2024-10-02
TechnologyHybridCalexico Chronicle · 2024-10-02
PPA offtakerImperial Irrigation DistrictCalexico Chronicle · 2024-10-02
Permit decisionGrantedCalexico Chronicle · 2024-10-02

About

Saved background

Generated Apr 10, 2026 · Predates Oct 24, 2026 queue source

Figures and claims below reflect the saved summary. See the queue record for reported project facts.

The CONDUIT ENERGY STORAGE project is a proposed 512.58 MW battery storage project located in San Bernardino County, California. The project is interconnected to the CAISO grid via the Lugo Substation 500 kV. It entered the CAISO interconnection queue as queue ID CAISO-2105 on April 15, 2021, with a proposed commercial operation date of February 26, 2031. Its interconnection status is currently in the System Impact Study phase.

The development project is listed in the CAISO interconnection queue and has been the subject of recent news coverage.

Summary provenance

Summary generated Apr 10, 2026 (UTC).

Source dates used by this summary were not recorded.

Dates in the current asset record

These may postdate the saved summary; they do not establish which inputs it used.

  • CAISO queue source as of: Oct 24, 2026.
Development Risk

Realization risk from now to commercial operation — financing close, EPC and tax-equity counterparty mix, and COD probability vs the proposed date. The diligence view that determines whether the deal actually closes. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Financing close probability
EPC + tax-equity counterparty
Project Details

State

CA

County

San Bernardino

Grid Region

CAISO (California)

Market

ISO/RTO Member

Developer

—

Utility

SCE

Entity

CAISO

Service Type

NRIS

Point of Interconnection

Lugo Substation 500 kV

Data Source

LBNL + Live

DeveloperOrmat TechnologiesEnergy-Storage.News · 2025-09-04
ApplicantNorthern Divide Energy Storage, LLCEnergy Storage News · 2026-04-07
AgencyNorth Dakota Public Service CommissionEnergy Storage News · 2026-04-07
RulingApprovalEnergy Storage News · 2026-04-07
Risk Analytics

Composite operating-phase risk view — what this asset's risk profile will look like once it commissions. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Generation Forecast

Forward generation outlook — first-year production estimate and 10-year P50 trajectory, with probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

10-year P50 forecast
First-year output estimate
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. First-year DSCR, 10-year cashflow, and counterparty exposure across price and policy scenarios. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

10-year revenue projection
First-year DSCR
Financing close risk
Market Context
Approximate
ISO / RTO
CAISO
Trading Hub
TH_SP15_GEN-APND
Hub Confidence
MEDIUM
POI Substation
Lugo Substation

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

Insights & Articles (3)Beta

Last updated 2026-04-09

View all articles
InfraSure platform

Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.