BOUSE SOLAR AND STORAGE PLANT
2,020.78 MW hybrid in La Paz, AZ · In queue since April 2021 · Proposed COD December 2033
2,020.78 MW
Capacity
2
Components
Solar + Battery
5y 7m
In Queue
System Impact Study
IA Phase
COD target: 2033
One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.
Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.
Total Duration
12y 8m
Study Phase
C14
Interconnection request submitted to ISO/RTO
Active sheet; C14
CAISO uses cluster studies where projects are batched annually and studied together.
Typical: 36–48 months (IR to IA)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2033-12-26
From dated articles. These observations may describe earlier stages or other project phases; see the queue record above for reported filing status.
Cross-source intelligence
Experimental assessment saved at the research date. See the queue record for reported project facts.
Research sources and reasoning (3 recorded sources)
low confidence at research time
- infrasure.ai/project/caiso-2052-bouse-solar-and-storage-plant
- cleanview.co/power-projects/planned/solar-farms/arizona/2052_photovoltaic/bouse-solar-and-storage-plant
- interxdata.com/projects/bouse-solar-and-storage-plant-caiso-public-queue-2052/
Commercial operation date: Only the LBNL proposed COD of 2033-12-26 exists. The aggregator pages (Infrasure: 'Proposed COD December 2033'; Cleanview: 'Expected online 2033') repeat the queue data and are not independent confirmation. No developer press release or news gives a different date.
Developer: The LBNL developer field is null and no search result names a developer or parent. The news-extracted 'Sun Streams 4' record appears to be a different project (a Maricopa County-area project), so I did not use it to attribute a developer.
Status: LBNL lists the project as active, in the System Impact Study phase with no IA date, and aggregators (Infrasure, Interxdata) show the same. The news record of 'under_construction' belongs to Sun Streams 4, which does not match this La Paz County, 2,020 MW CAISO-2052 project, so I discarded it.
About
Generated Apr 10, 2026 · Predates Oct 24, 2026 queue source
Figures and claims below reflect the saved summary. See the queue record for reported project facts.
The BOUSE SOLAR AND STORAGE PLANT is a proposed hybrid solar and battery project located in La Paz County, Arizona. The development project has a total capacity of 2020.78 MW, consisting of 1009.9 MW of solar generation and 1010.88 MW of battery storage. The project is in the California Independent System Operator (CAISO) interconnection queue, identified as CAISO-2052, with a queue entry date of April 15, 2021. The proposed commercial operation date is December 26, 2033.
The project's interconnection status is currently in the System Impact Study phase. The point of interconnection (POI) is the Colorado River - Palo Verde 500kV line, and the interconnecting utility is Southern California Edison (SCE). The BOUSE SOLAR AND STORAGE PLANT has been featured in recent news coverage.
Summary provenance
Summary generated Apr 10, 2026 (UTC).
Source dates used by this summary were not recorded.
Dates in the current asset record
These may postdate the saved summary; they do not establish which inputs it used.
- CAISO queue source as of: Oct 24, 2026.
Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.
See the full development-risk decomposition for this project.
State
AZ
County
La Paz
Grid Region
CAISO (California)
Market
ISO/RTO Member
Developer
—
Utility
SCE
Entity
CAISO
Service Type
NRIS
Point of Interconnection
Colorado River - Palo Verde 500kV
Data Source
LBNL + Live
Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.
See the full risk decomposition + scenarios for this project.
Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this project.
Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this project.
- ISO / RTO
- CAISO
- Trading Hub
- TH_SP15_GEN-APND
- Hub Confidence
- MEDIUM
- POI Substation
- Verde
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
Last updated 2026-04-19
View all articlesSolar queue pipeline by status
Data tables and metrics from the InfraSure database.
Geothermal queue pipeline overview
Summary analysis with parallel narrative sections and visualizations.
Battery Storage queue pipeline by status
Data tables and metrics from the InfraSure database.
AEP Jacksonville Solar Project
Cross-dimensional entity briefing with KPIs, news intelligence, and fleet analysis.
Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.