WINGTIP SOLAR 1 (CAISO-1943) — Project Summary

Queue ID
CAISO-1943
Capacity
2352.2 MW
Technology
Solar+Battery
Status
active
Location
Merced, CA
Region
CAISO
Developer
—
IA Status
IA Executed

WINGTIP SOLAR 1

CAISO-1943BetaActiveSolarBatteryCAISOLBNL + Live

2,352.2 MW hybrid in Merced, CA · In queue since April 2021 · Proposed COD September 2032

BA: CISOISO/RTO: CAISONERC: WECCRC: RCW

2,352.2 MW

Capacity

2

Components

Solar + Battery

5y 7m

In Queue

IA Executed

IA Phase

Signed Jun 2025

Asset Intelligence Map

One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.

5 live dimensions
4 decision models

Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.

Structured from the current asset record; empty data branches are omitted.Locked nodes are InfraSure decision models; no simulated values shown.
Interconnection

Queue → IA

4y 2m

IA → COD

7y 3m

Total Duration

4y 2m

Study Phase

C14

Construction75%
Queue EntryApr 15, 2021

Interconnection request submitted to ISO/RTO

Cluster Study (Phase I/II)

CAISO uses cluster studies where projects are batched annually and studied together.

Typical: 36–48 months (IR to IA)

Interconnection AgreementJun 2, 2025

Interconnection agreement executed — binding commitment to build

Typical: 30–60 days (negotiation)

ConstructionCurrent

Active sheet; IA Executed; C14

Project under construction

Typical: 18–30 months

Commercial Operation

Proposed COD: 2032-09-18

Cross-source intelligence

Saved research · Beta
Researched Oct 25, 2026

Experimental assessment saved at the research date. See the queue record for reported project facts.

Research COD
Sep 18, 2032
From queue filing
Developer in saved assessment
—
Status at research time
Active
Active in the CAISO queue with an interconnection agreement executed June 2025. No construction start or permit approval found. The POI is Los Banos 500 kV.
Financing
Not recorded

Milestones in this assessment

IA executedJun 2, 2025Latest in this assessment

Interconnection agreement executed for the 2,352 MW solar+battery hybrid (Infrasure: 'Signed Jun 2025'; LBNL ia_date 2025-06-02).

infrasure.ai
Research sources and reasoning (3 recorded sources)

low confidence at research time

  1. infrasure.ai/project/caiso-1943-wingtip-solar-1
  2. interconnection.fyi/project/caiso-1943
  3. app.nrgmap.com/queues/caiso-1943

Commercial operation date: Every source that gives a COD (interconnection.fyi, Infrasure, Cleanview) repeats the LBNL/CAISO proposed date of September 18, 2032. They are aggregators of the same queue data, not independent confirmations, and no developer press release or news article gives a financing-backed target.

Developer: The LBNL developer field is null. The aggregator pages hide the developer behind a paywall or omit it. The Merced Focus article describes a Los Banos solar and battery project but, in the snippet, does not name Wingtip Solar 1 or a sponsor, so I cannot attribute it.

Status: LBNL lists the project as active with IA Executed (2025-06-02). NRG Map and InterXData show it still active as of late September 2026. No withdrawal or construction signals were found.

About

Saved background

Generated Apr 10, 2026 · Predates Oct 24, 2026 queue source

Figures and claims below reflect the saved summary. See the queue record for reported project facts.

WINGTIP SOLAR 1 is a proposed solar and battery hybrid project located in Merced County, California. The development project has a total capacity of 2352.2 MW, consisting of 1176.1 MW of solar generation and 1176.1 MW of battery energy storage.

The project is in the CAISO interconnection queue (queue ID CAISO-1943) with an entry date of April 15, 2021. The proposed commercial operation date is September 18, 2032. The project's interconnection status is currently in the System Impact Study phase. The point of interconnection is the Los Banos 500 kV substation.

Summary provenance

Summary generated Apr 10, 2026 (UTC).

Source dates used by this summary were not recorded.

Dates in the current asset record

These may postdate the saved summary; they do not establish which inputs it used.

  • CAISO queue source as of: Oct 24, 2026.
Development Risk

Realization risk from now to commercial operation — financing close, EPC and tax-equity counterparty mix, and COD probability vs the proposed date. The diligence view that determines whether the deal actually closes. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Financing close probability
EPC + tax-equity counterparty
Project Details

State

CA

County

Merced

Grid Region

CAISO (California)

Market

ISO/RTO Member

Developer

—

Utility

PGAE

Entity

CAISO

Service Type

NRIS

Point of Interconnection

Los Banos 500 kV

Data Source

LBNL + Live

Risk Analytics

Composite operating-phase risk view — what this asset's risk profile will look like once it commissions. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Technology
Solar1,176.1 MW · 50%
Battery1,176.1 MW · 50%
Generation Forecast

Forward generation outlook — first-year production estimate and 10-year P50 trajectory, with probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

10-year P50 forecast
First-year output estimate
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. First-year DSCR, 10-year cashflow, and counterparty exposure across price and policy scenarios. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

10-year revenue projection
First-year DSCR
Financing close risk
Market Context
Approximate
ISO / RTO
CAISO
Trading Hub
TH_ZP26_GEN-APND
Hub Confidence
MEDIUM
Nearest Node (Estimated)
SNTANLA_6_N001
POI Substation
Los Banos Substation

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No insights available for this project.
InfraSure platform

Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.