ALLIUM HYBRID
224.877 MW hybrid in San Benito, CA · In queue since April 2021 · Proposed COD December 2030
224.877 MW
Capacity
2
Components
Solar + Battery
5y 7m
In Queue
IA Executed
IA Phase
Signed Mar 2025
One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.
Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.
Queue → IA
3y 11m
IA → COD
5y 9m
Total Duration
3y 11m
Study Phase
C14
Interconnection request submitted to ISO/RTO
CAISO uses cluster studies where projects are batched annually and studied together.
Typical: 36–48 months (IR to IA)
Interconnection agreement executed — binding commitment to build
Typical: 30–60 days (negotiation)
Active sheet; IA Executed; C14
Project under construction
Typical: 18–30 months
Proposed COD: 2030-12-15
Cross-source intelligence
Experimental assessment saved at the research date. Predates the Oct 24, 2026 queue source. Research and queue COD differ; this comparison does not confirm either date. See the queue record for reported project facts.
Milestones in this assessment
Toll PPA signed with Marin Clean Energy for 110 MW solar + 440 MWh battery storage
energy-storage.newsLarge Generator Interconnection Agreement executed with CAISO
caiso.comResearch sources and reasoning (4 recorded sources)
high confidence at research time
- energy-storage.news/longroad-signs-toll-ppa-for-hybrid-solar-bess-project-in-california-with-marin-clean-energy/
- thesanbenitoblueprint.com/2026/02/16/a-deeper-look-the-allium-solar-project/
- mcecleanenergy.org/wp-content/uploads/2025/01/MCE-Technical_Committee-Packet-February_2025.pdf
- caiso.com/documents/list-of-large-generator-interconnection-agreements-and-small-generator-interconnection-agreements.pdf
Commercial operation date: LBNL proposes 2030-12-15 COD. No news sources provide an alternative target date. PPA signed Feb 2025 with MCE suggests earlier timeline is possible, but no explicit COD commitment found in search results.
Developer: LBNL filing entity is 'Allium Hybrid LLC' (Delaware LLC per MCE packet). Multiple Feb 2025 news sources (Energy-Storage.News, LinkedIn) confirm Longroad Energy as the operating developer signing the PPA with MCE.
Status: LBNL shows IA executed March 2025. Longroad Energy announced PPA signing with MCE in Feb 2025 for 110 MW solar + 440 MWh storage, confirming active commercial development.
About
Generated Apr 10, 2026 · Predates Oct 24, 2026 queue source
Figures and claims below reflect the saved summary. See the queue record for reported project facts.
The ALLIUM HYBRID project is a proposed 224.88 MW hybrid solar and battery energy storage development in San Benito County, California. The project consists of a 112.49 MW solar array coupled with a 112.39 MW battery energy storage system. It is located within the CAISO region and interconnects to the PGAE utility grid at the Crazy Horse Canyon-Hollister 115 kV Line.
The project, identified as CAISO-1921 in the CAISO interconnection queue, entered the queue on April 15, 2021. Its proposed commercial operation date is December 15, 2030. The project's interconnection status is currently in the System Impact Study phase.
Summary provenance
Summary generated Apr 10, 2026 (UTC).
Source dates used by this summary were not recorded.
Dates in the current asset record
These may postdate the saved summary; they do not establish which inputs it used.
- CAISO queue source as of: Oct 24, 2026.
Realization risk from now to commercial operation — financing close, EPC and tax-equity counterparty mix, and COD probability vs the proposed date. The diligence view that determines whether the deal actually closes. Powered by InfraSure's development-stage modeling stack.
See the full development-risk decomposition for this project.
State
CA
County
San Benito
Grid Region
CAISO (California)
Market
ISO/RTO Member
Developer
—
Utility
PGAE
Entity
CAISO
Service Type
NRIS
Point of Interconnection
Crazy Horse Canyon-Hollister 115 kV Line
Data Source
LBNL + Live
Composite operating-phase risk view — what this asset's risk profile will look like once it commissions. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.
See the full risk decomposition + scenarios for this project.
Forward generation outlook — first-year production estimate and 10-year P50 trajectory, with probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this project.
Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. First-year DSCR, 10-year cashflow, and counterparty exposure across price and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this project.
- ISO / RTO
- CAISO
- Trading Hub
- TH_ZP26_GEN-APND
- Hub Confidence
- LOW
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
can you provide me with the capacity factor for allrenewable facilities in 2024
Data tables and metrics from the InfraSure database.
Allium
Data-driven briefing on Allium — fleet, generation, financial, and news signals.
can you provide me with the capacity factor for allrenewable facilities in 2024
Data tables and metrics from the InfraSure database.
ALLIUM HYBRID
Data-driven briefing on ALLIUM HYBRID — fleet, generation, financial, and news signals.
Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.