ALLIUM HYBRID is a 225 MW Solar+Battery project in California, currently active.
The reported queue phase is C14. Proposed COD is 2030-12-15.
- Queue ID
- CAISO-1921
- Location
- San Benito, California
- Technology
- Solar+Battery
- Market / region
- CAISO
- Point of interconnection
- Crazy Horse Canyon-Hollister 115 kV Line
What stands out
1
ALLIUM HYBRID is a 225 MW Solar+Battery project in California with status active.
2
The reported queue phase is C14; proposed COD is 2030-12-15.
Market and operating context
- Queue date
- 2021-04-15
- Proposed COD
- 2030-12-15
- IA status
- IA Executed
- Study phase
- C14
- Service type
- NRIS
Why it matters
Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.