ALLEGHENY ENERGY STORAGE
353.2 MW storage in Contra Costa, CA · In queue since April 2021 · Proposed COD September 2032
353.2 MW
Capacity
1
Components
Battery
5y 7m
In Queue
IA Executed
IA Phase
Signed Aug 2025
One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.
Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.
Queue → IA
4y 4m
IA → COD
7y 1m
Total Duration
4y 4m
Study Phase
C14
Interconnection request submitted to ISO/RTO
CAISO uses cluster studies where projects are batched annually and studied together.
Typical: 36–48 months (IR to IA)
Interconnection agreement executed — binding commitment to build
Typical: 30–60 days (negotiation)
Active sheet; IA Executed; C14
Project under construction
Typical: 6–18 months
Proposed COD: 2032-09-20
From dated articles. These observations may describe earlier stages or other project phases; see the queue record above for reported filing status.
Cross-source intelligence
Experimental assessment saved at the research date. See the queue record for reported project facts.
Milestones in this assessment
Interconnection agreement executed for the 353.2 MW battery project (signed Aug 2025 per Infrasure, matching LBNL).
infrasure.aiProposed COD of Sept 20, 2032 per the queue listing; no developer-confirmed target.
interconnection.fyiResearch sources and reasoning (4 recorded sources)
low confidence at research time
- interconnection.fyi/project/caiso-1872
- infrasure.ai/project/caiso-1872-allegheny-energy-storage
- app.nrgmap.com/queues/caiso-1872
- cleanview.co/power-projects/planned/battery-storage-projects/california/1872_storage/allegheny-energy-storage
Commercial operation date: Only the LBNL proposed COD of 2032-09-20 exists; aggregator sites (interconnection.fyi, Cleanview, Infrasure) just repeat the queue date, so they are not independent confirmation. No developer press release or news article gives a different target.
Developer: LBNL developer field is null. The news-extracted company (Virginia Electric & Power Co.) comes from a 1980 Washington Post article on unrelated energy topics and is not credible for this CAISO battery project. No search result names a developer.
Status: LBNL shows status active with IA executed 2025-08-07. NRG Map and interconnection.fyi both list it as active. No source reports construction or withdrawal.
About
Generated Apr 10, 2026 · Predates Oct 24, 2026 queue source
Figures and claims below reflect the saved summary. See the queue record for reported project facts.
The ALLEGHENY ENERGY STORAGE project is a proposed 353.2 MW battery storage development in Contra Costa County, California. The project is located within the CAISO region and is interconnected with Pacific Gas & Electric (PGAE). It entered the CAISO interconnection queue as queue ID CAISO-1872 on April 15, 2021, with a proposed commercial operation date of September 20, 2032. Its interconnection status is currently in the System Impact Study phase.
The ALLEGHENY ENERGY STORAGE project has been the subject of recent news coverage, with 18 articles appearing in the press. These articles primarily focus on regulatory and industry aspects of the project.
Summary provenance
Summary generated Apr 10, 2026 (UTC).
Source dates used by this summary were not recorded.
Dates in the current asset record
These may postdate the saved summary; they do not establish which inputs it used.
- CAISO queue source as of: Oct 24, 2026.
Realization risk from now to commercial operation — financing close, EPC and tax-equity counterparty mix, and COD probability vs the proposed date. The diligence view that determines whether the deal actually closes. Powered by InfraSure's development-stage modeling stack.
See the full development-risk decomposition for this project.
State
CA
County
Contra Costa
Grid Region
CAISO (California)
Market
ISO/RTO Member
Developer
—
Utility
PGAE
Entity
CAISO
Service Type
NRIS
Point of Interconnection
Pittsburg 115 kV
Data Source
LBNL + Live
Composite operating-phase risk view — what this asset's risk profile will look like once it commissions. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.
See the full risk decomposition + scenarios for this project.
Forward generation outlook — first-year production estimate and 10-year P50 trajectory, with probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this project.
Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. First-year DSCR, 10-year cashflow, and counterparty exposure across price and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this project.
- ISO / RTO
- CAISO
- Trading Hub
- TH_NP15_GEN-APND
- Hub Confidence
- MEDIUM
- Nearest Node (Estimated)
- PITTES1_2_N007
- POI Substation
- Pittsburg Substation
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
Last updated 2026-03-26
View all articlesBattery storage queue pipeline
Summary analysis with parallel narrative sections and visualizations.
Battery Storage queue pipeline overview
Summary analysis with parallel narrative sections and visualizations.
Battery Storage queue pipeline overview
Summary analysis with parallel narrative sections and visualizations.
Battery Storage queue pipeline overview
Summary analysis with parallel narrative sections and visualizations.
Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.