CORBY 2
475.96 MW storage in Solano, CA · In queue since April 2021 · Proposed COD March 2031
475.96 MW
Capacity
1
Components
Battery
5y 7m
In Queue
System Impact Study
IA Phase
COD target: 2031
One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.
Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.
Total Duration
9y 11m
Study Phase
C14
Interconnection request submitted to ISO/RTO
Active sheet; C14
CAISO uses cluster studies where projects are batched annually and studied together.
Typical: 36–48 months (IR to IA)
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2031-03-16
Cross-source intelligence
Experimental assessment saved at the research date. See the queue record for reported project facts.
Research sources and reasoning (5 recorded sources)
low confidence at research time
- infrasure.ai/project/caiso-1854-corby-2
- cleanview.co/power-projects/planned/battery-storage-projects/california/1854_storage/corby-2
- interxdata.com/projects/corby-2-caiso-public-queue-1854/
- efiling.energy.ca.gov/GetDocument.aspx?tn=272525&DocumentContentId=120230
- energy-storage.news/nextera-turns-to-california-state-regulator-for-1.2gwh-bess-to-get-around-citys-moratorium/
Commercial operation date: Only the LBNL/CAISO queue date exists. Cleanview and Infrasure repeat it ("Proposed COD: 2031-03-16") but appear to be derived from the queue data, so they are not independent confirmation. No developer press release or news item gives a financing-backed target.
Developer: The LBNL developer field is null, and no result names a developer for CORBY 2. The CEC filings and the NextEra/Solano County article suggest a nearby NextEra-related Corby BESS, but none ties CORBY 2 (Q1854) to a specific owner, so I did not infer one.
Status: LBNL shows active, and CAISO-derived aggregators (interxdata, interconnection.fyi, Infrasure) show active and still in the System Impact Study. No source shows withdrawal, construction or an executed IA.
About
Generated Apr 10, 2026 · Predates Oct 24, 2026 queue source
Figures and claims below reflect the saved summary. See the queue record for reported project facts.
The proposed CORBY 2 project is a 475.96 MW battery storage development in Solano County, California. It is located within the CAISO region and is interconnected with PG&E at the Vaca-Dixon 230 kV point of interconnection. The project entered the CAISO interconnection queue as queue ID CAISO-1854 on April 15, 2021.
The project's interconnection status is currently in the System Impact Study phase, with a proposed commercial operation date of March 16, 2031. Recent news coverage has discussed the project.
Summary provenance
Summary generated Apr 10, 2026 (UTC).
Source dates used by this summary were not recorded.
Dates in the current asset record
These may postdate the saved summary; they do not establish which inputs it used.
- CAISO queue source as of: Oct 24, 2026.
Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.
See the full development-risk decomposition for this project.
State
CA
County
Solano
Grid Region
CAISO (California)
Market
ISO/RTO Member
Developer
—
Utility
PGAE
Entity
CAISO
Service Type
NRIS
Point of Interconnection
Vaca-Dixon 230 kV
Data Source
LBNL + Live
Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.
See the full risk decomposition + scenarios for this project.
Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this project.
Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this project.
- ISO / RTO
- CAISO
- Trading Hub
- TH_NP15_GEN-APND
- Hub Confidence
- LOW
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
Battery Storage queue pipeline by status
Data tables and metrics from the InfraSure database.
Battery storage queue pipeline
Summary analysis with parallel narrative sections and visualizations.
Battery Storage queue pipeline overview
Summary analysis with parallel narrative sections and visualizations.
CORBY 2 queue pipeline — 1 projects by technology and status
Data-driven briefing on CORBY 2 — fleet, generation, financial, and news signals.
Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.