DELAMAR ENERGY STORAGE (CAISO-1796) — Project Summary

Queue ID
CAISO-1796
Capacity
256.29 MW
Technology
Battery
Status
active
Location
Clark, NV
Region
CAISO
Developer
—
IA Status
IA Executed

DELAMAR ENERGY STORAGE

CAISO-1796BetaActiveBatteryCAISOLBNL + Live

256.29 MW storage in Clark, NV · In queue since April 2020 · Proposed COD June 2027

BA: NEVPISO/RTO: CAISONERC: WECCRC: SPPW

256.29 MW

Capacity

1

Components

Battery

6y 7m

In Queue

IA Executed

IA Phase

Signed Oct 2022

Asset Intelligence Map

One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.

5 live dimensions
4 decision models

Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.

Structured from the current asset record; empty data branches are omitted.Locked nodes are InfraSure decision models; no simulated values shown.
Interconnection

Queue → IA

2y 6m

IA → COD

4y 8m

Total Duration

2y 6m

Study Phase

C13

Construction75%
Queue EntryApr 15, 2020

Interconnection request submitted to ISO/RTO

Cluster Study (Phase I/II)

CAISO uses cluster studies where projects are batched annually and studied together.

Typical: 36–48 months (IR to IA)

Interconnection AgreementOct 19, 2022

Interconnection agreement executed — binding commitment to build

Typical: 30–60 days (negotiation)

ConstructionCurrent

Active sheet; IA Executed; C13

Project under construction

Typical: 6–18 months

Commercial Operation

Proposed COD: 2027-06-01

Cross-source intelligence

Saved research · Beta
Researched Jun 1, 2026

Experimental assessment saved at the research date. Predates the Oct 24, 2026 queue source. See the queue record for reported project facts.

Research COD
Jun 1, 2027
From queue filing
Developer in saved assessment
—
From queue filing
Status at research time
Active
Active — IA executed 2022-10-19, project remains in CAISO queue with 250 MW planned capacity near Boulder City
Financing
Not recorded

Milestones in this assessment

Permit approvedMay 2022

NDOW Energy Review Program application submitted May 2022

ndow.org
IA executedOct 19, 2022Latest in this assessment

Large Generator Interconnection Agreement executed with CAISO

caiso.com
Research sources and reasoning (6 recorded sources)

medium confidence at research time

  1. wecc.org/sites/default/files/documents/progress_report/2025/Delamar%20Energy%20Storage%202025%20APR.pdf
  2. wecc.org/sites/default/files/documents/progress_report/2026/Delamar%20Energy%20Storage%202026%20APR.pdf
  3. caiso.com/documents/listlargegeneratorinterconnection_smallgeneratorinterconnectionagreements.pdf
  4. ndow.org/wp-content/uploads/2023/02/Energy-Review-Program-Application-Summary-Table-020623.pdf
  5. bouldercityreview.com/news/request-for-more-solar-okd-67173/
  6. pv-magazine-usa.com/2025/01/09/majority-woman-owned-developer-begins-construction-on-solar-battery-facility-in-nevada/

Commercial operation date: LBNL queue shows proposed COD of 2027-06-01. No recent press releases or news articles provide an updated commercial operation target. WECC progress reports from 2025-2026 confirm the project remains planned but do not specify revised COD dates.

Developer: All sources reference only the project LLC 'Delamar Energy Storage, LLC' as the filing entity. No press releases, corporate announcements, or news articles identify a parent operating company or developer. The pv-magazine article about a 'majority woman-owned developer' in Nevada refers to a different 185 MW solar + 400 MWh project, not this 256 MW battery-only facility.

Status: LBNL shows 'active' status with IA executed in October 2022. WECC 2025 and 2026 progress reports confirm the project is still planned as a 250 MW lithium-ion battery storage facility. No withdrawal or cancellation signals found.

About

Saved background

Generated Apr 10, 2026 · Predates Oct 24, 2026 queue source

Figures and claims below reflect the saved summary. See the queue record for reported project facts.

The Delamar Energy Storage project is a proposed 256.29 MW battery storage project located in Clark County, Nevada. The project is in the California Independent System Operator (CAISO) interconnection queue, identified as CAISO-1796, with a queue entry date of April 15, 2020. The proposed commercial operation date is June 1, 2027. The interconnection agreement (IA) for the project was executed on October 19, 2022. The point of interconnection is the Eldorado Substation 230kV, and the project has appeared in recent industry news.

The development project consists solely of battery storage, with a total capacity of 256.29 MW. The project's interconnection utility is Southern California Edison (SCE), and the interconnection entity is CAISO.

Summary provenance

Summary generated Apr 10, 2026 (UTC).

Source dates used by this summary were not recorded.

Dates in the current asset record

These may postdate the saved summary; they do not establish which inputs it used.

  • CAISO queue source as of: Oct 24, 2026.
Development Risk

Realization risk from now to commercial operation — financing close, EPC and tax-equity counterparty mix, and COD probability vs the proposed date. The diligence view that determines whether the deal actually closes. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Financing close probability
EPC + tax-equity counterparty
Project Details

State

NV

County

Clark

Grid Region

CAISO (California)

Market

ISO/RTO Member

Developer

—

Utility

SCE

Entity

CAISO

Service Type

NRIS

Point of Interconnection

Eldorado Substation 230kV

Data Source

LBNL + Live

Risk Analytics

Composite operating-phase risk view — what this asset's risk profile will look like once it commissions. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Generation Forecast

Forward generation outlook — first-year production estimate and 10-year P50 trajectory, with probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

10-year P50 forecast
First-year output estimate
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. First-year DSCR, 10-year cashflow, and counterparty exposure across price and policy scenarios. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

10-year revenue projection
First-year DSCR
Financing close risk
Market Context
Approximate
ISO / RTO
CAISO
Trading Hub
TH_ZP26_GEN-APND
Hub Confidence
MEDIUM
Nearest Node (Estimated)
MCCULLGH_5_N101
POI Substation
Eldorado Substation

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No insights available for this project.
InfraSure platform

Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.