WINDWALKER OFFSHORE
1,028.94 MW generation in San Luis Obispo, CA · In queue since April 2020 · Proposed COD February 2028
1,028.94 MW
Capacity
1
Components
Offshore Wind
6y 7m
In Queue
IA Executed
IA Phase
Signed Jan 2023
One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.
Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.
Queue → IA
2y 9m
IA → COD
5y 1m
Total Duration
2y 9m
Study Phase
C13
Interconnection request submitted to ISO/RTO
CAISO uses cluster studies where projects are batched annually and studied together.
Typical: 36–48 months (IR to IA)
Interconnection agreement executed — binding commitment to build
Typical: 30–60 days (negotiation)
Active sheet; IA Executed; C13
Project under construction
Typical: 36–60 months
Proposed COD: 2028-02-12
Cross-source intelligence
Experimental assessment saved at the research date. See the queue record for reported project facts.
Milestones in this assessment
Interconnection Agreement executed for the 1,028.94 MW project, with POI at Diablo Canyon 500 kV (PG&E).
infrasure.aiResearch sources and reasoning (4 recorded sources)
low confidence at research time
- infrasure.ai/project/caiso-1750-windwalker-offshore
- caiso.com/documents/briefing-resourcesavailable-nearterminterconnection.pdf
- interxdata.com/projects/windwalker-offshore-caiso-public-queue-1750/
- cleanview.co/power-projects/planned/wind-farms/california/1750_wind_turbine/windwalker-offshore
Commercial operation date: Every source that gives a COD (infrasure, cleanview, interxdata) repeats the LBNL/CAISO queue date of 2028-02-12 ('Proposed COD: 2028-02-12'). None is an independent developer or press-release signal, so no correction is possible.
Developer: The LBNL developer field is null. No search result names a developer, sponsor, or parent company; the only press-type hits are generic California wind commentary or unrelated (a boat).
Status: LBNL status is 'active' and the aggregator pages (interconnection.fyi, interxdata, infrasure) agree. Nothing indicates withdrawal or suspension; the 'withdrawn' entry in the ustechautomations snippet refers to the neighboring Western Coast Wind 1 project (ID 1748), not this one.
About
Generated Apr 10, 2026 · Predates Oct 24, 2026 queue source
Figures and claims below reflect the saved summary. See the queue record for reported project facts.
The WINDWALKER OFFSHORE project is a proposed 1028.94 MW offshore wind generation project located in San Luis Obispo County, California. The project is in the CAISO interconnection queue as entry CAISO-1750, with a queue entry date of April 15, 2020, and a proposed commercial operation date of February 12, 2028. The interconnecting utility is PG&E.
The project's Interconnection Agreement (IA) was executed on January 8, 2023. The point of interconnection (POI) is the Diablo Canyon 500 kV substation. The WINDWALKER OFFSHORE project has been mentioned in recent news coverage.
Summary provenance
Summary generated Apr 10, 2026 (UTC).
Source dates used by this summary were not recorded.
Dates in the current asset record
These may postdate the saved summary; they do not establish which inputs it used.
- CAISO queue source as of: Oct 24, 2026.
Realization risk from now to commercial operation — financing close, EPC and tax-equity counterparty mix, and COD probability vs the proposed date. The diligence view that determines whether the deal actually closes. Powered by InfraSure's development-stage modeling stack.
See the full development-risk decomposition for this project.
State
CA
County
San Luis Obispo
Grid Region
CAISO (California)
Market
ISO/RTO Member
Developer
—
Utility
PGAE
Entity
CAISO
Service Type
NRIS
Point of Interconnection
Diablo Canyon 500 kV
Data Source
LBNL + Live
Composite operating-phase risk view — what this asset's risk profile will look like once it commissions. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.
See the full risk decomposition + scenarios for this project.
Forward generation outlook — first-year production estimate and 10-year P50 trajectory, with probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this project.
Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. First-year DSCR, 10-year cashflow, and counterparty exposure across price and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this project.
- ISO / RTO
- CAISO
- Trading Hub
- TH_SP15_GEN-APND
- Hub Confidence
- MEDIUM
- Nearest Node (Estimated)
- DIABLO2_7_B1
- POI Substation
- Diablo Canyon
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
Geothermal queue pipeline overview
Summary analysis with parallel narrative sections and visualizations.
Max 4 Wind
Data tables and metrics from the InfraSure database.
FPL Energy Oliver Wind II LLC
Cross-dimensional entity briefing with KPIs, news intelligence, and fleet analysis.
FPL Energy Oliver Wind I LLC
Cross-dimensional entity briefing with KPIs, news intelligence, and fleet analysis.
Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.