PELICANS JAW HYBRID SOLAR
1,000 MW hybrid in Kings, CA · In queue since April 2019 · Proposed COD January 2028
1,000 MW
Capacity
2
Components
Solar + Battery
7y 7m
In Queue
IA Executed
IA Phase
Signed Sep 2022
One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.
Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.
Queue → IA
3y 5m
IA → COD
5y 4m
Total Duration
3y 5m
Study Phase
C12
Interconnection request submitted to ISO/RTO
CAISO uses cluster studies where projects are batched annually and studied together.
Typical: 36–48 months (IR to IA)
Interconnection agreement executed — binding commitment to build
Typical: 30–60 days (negotiation)
Active sheet; IA Executed; C12
Project under construction
Typical: 18–30 months
Proposed COD: 2028-01-24
Cross-source intelligence
Experimental assessment saved at the research date. See the queue record for reported project facts.
Milestones in this assessment
Interconnection Agreement executed for CAISO-1593 (PG&E, Gates-Midway 230 kV).
infrasure.aiResearch sources and reasoning (4 recorded sources)
low confidence at research time
- sbenergy.com/project/pelicans-jaw/
- infrasure.ai/project/caiso-1593-pelicans-jaw-hybrid-solar
- ceqanet.lci.ca.gov/2022110558
- interconnection.fyi/project/caiso-1593
Commercial operation date: Only the LBNL proposed COD of 2028-01-24 is available. The aggregator pages (Infrasure, interconnection.fyi, Cleanview) repeat it and add no independent signal. SB Energy's page says only 'currently under construction' and gives no target date.
Developer: LBNL lists no developer, so there is nothing to compare against. SB Energy's site lists a 'Pelican's Jaw' solar and storage project, but it places it in Kern County, not Kings County. The name match is strong and the county mismatch is unresolved, so this attribution is tentative.
Status: LBNL shows active with an executed IA, and the CEQA documents (2022-2023) are consistent with a project in development. The only construction claim comes from a page with a county discrepancy, so I did not upgrade the status to Construction.
About
Generated Apr 10, 2026 · Predates Oct 24, 2026 queue source
Figures and claims below reflect the saved summary. See the queue record for reported project facts.
PELICANS JAW HYBRID SOLAR is a proposed 1000 MW hybrid solar and battery project located in Kings County, California. The development project consists of 500 MW of solar generation and 500 MW of battery energy storage. It is interconnected to the CAISO grid at the Gates-Midway 230 kV Line.
The project, identified as CAISO-1593 in the CAISO interconnection queue, entered the queue on April 15, 2019, and has a proposed commercial operation date of January 24, 2028. An Interconnection Agreement (IA) was executed on September 25, 2022. The utility is PG&E. The project has appeared in recent news coverage.
Summary provenance
Summary generated Apr 10, 2026 (UTC).
Source dates used by this summary were not recorded.
Dates in the current asset record
These may postdate the saved summary; they do not establish which inputs it used.
- CAISO queue source as of: Oct 24, 2026.
Realization risk from now to commercial operation — financing close, EPC and tax-equity counterparty mix, and COD probability vs the proposed date. The diligence view that determines whether the deal actually closes. Powered by InfraSure's development-stage modeling stack.
See the full development-risk decomposition for this project.
State
CA
County
Kings
Grid Region
CAISO (California)
Market
ISO/RTO Member
Developer
—
Utility
PGAE
Entity
CAISO
Service Type
NRIS
Point of Interconnection
Gates-Midway 230 kV Line
Data Source
LBNL + Live
Composite operating-phase risk view — what this asset's risk profile will look like once it commissions. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.
See the full risk decomposition + scenarios for this project.
Forward generation outlook — first-year production estimate and 10-year P50 trajectory, with probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this project.
Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. First-year DSCR, 10-year cashflow, and counterparty exposure across price and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this project.
- ISO / RTO
- CAISO
- Trading Hub
- TH_ZP26_GEN-APND
- Hub Confidence
- LOW
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
Solar queue pipeline by status
Data tables and metrics from the InfraSure database.
Geothermal queue pipeline overview
Summary analysis with parallel narrative sections and visualizations.
Battery Storage queue pipeline by status
Data tables and metrics from the InfraSure database.
AEP Jacksonville Solar Project
Cross-dimensional entity briefing with KPIs, news intelligence, and fleet analysis.
Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.