HEARTLAND 1 (CAISO-1379) — Project Summary

Queue ID
CAISO-1379
Capacity
228.31 MW
Technology
Solar+Battery
Status
active
Location
Fresno, CA
Region
CAISO
Developer
—
IA Status
IA Executed

HEARTLAND 1

CAISO-1379BetaActiveSolarBatteryCAISOLBNL + Live

228.31 MW hybrid in Fresno, CA · In queue since May 2017 · Proposed COD June 2028

BA: CISOISO/RTO: CAISONERC: WECCRC: RCW

228.31 MW

Capacity

2

Components

Solar + Battery

9y 6m

In Queue

IA Executed

IA Phase

Signed Dec 2023

Asset Intelligence Map

One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.

5 live dimensions
4 decision models

Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.

Structured from the current asset record; empty data branches are omitted.Locked nodes are InfraSure decision models; no simulated values shown.
Interconnection

Queue → IA

6y 7m

IA → COD

4y 6m

Total Duration

6y 7m

Study Phase

C10

Construction75%
Queue EntryMay 1, 2017

Interconnection request submitted to ISO/RTO

Cluster Study (Phase I/II)

CAISO uses cluster studies where projects are batched annually and studied together.

Typical: 36–48 months (IR to IA)

Interconnection AgreementDec 4, 2023

Interconnection agreement executed — binding commitment to build

Typical: 30–60 days (negotiation)

ConstructionCurrent

Active sheet; IA Executed; C10

Project under construction

Typical: 18–30 months

Commercial Operation

Proposed COD: 2028-06-30

News-reported activity

From dated articles. These observations may describe earlier stages or other project phases; see the queue record above for reported filing status.

Latest milestoneboard approval · 2024-12Canary Media · 2026-01-12

Cross-source intelligence

Saved research · Beta
Researched Oct 25, 2026

Experimental assessment saved at the research date. See the queue record for reported project facts.

Research COD
Jun 30, 2028
From queue filing
Developer in saved assessment
Golden State Clean Energy
Status at research time
IA Executed
IA Executed December 2023; CEQA environmental review application on file (Heartland Solar Project, ~300 MW AC solar + 300 MW storage, western Fresno County); project tracking toward 2028 COD with no construction start confirmed.
Financing
Not recorded

Milestones in this assessment

Permit approved2022

CEQA application filed for Heartland Solar Project (~300 MW AC solar + 300 MW storage) in western Fresno County

ceqanet.lci.ca.gov
IA executedDec 4, 2023

Interconnection Agreement executed with CAISO per LBNL queue record

COD targetJun 30, 2028Latest in this assessment

Target COD per CAISO queue and confirmed by CleanView tracking of CAISO-1379

cleanview.co
Research sources and reasoning (8 recorded sources)

low confidence at research time

  1. canarymedia.com/articles/solar/biggest-us-solar-storage-project-california
  2. ceqanet.lci.ca.gov/2022100609/2
  3. cleanview.co/power-projects/planned/battery-storage-projects/california/1379_storage/heartland-1
  4. cleanview.co/power-projects/planned/solar-farms/california/1379_photovoltaic/heartland-1
  5. interconnection.fyi/project/caiso-1379
  6. infrasure.ai/project/caiso-1379-heartland-1
  7. governing.com/infrastructure/massive-solar-plan-aims-to-transform-californias-agricultural-heartland
  8. taiyangnews.info/markets/north-america-pv-news-snippets-hangzhou-firsts-steve-akey-at-re-in-california-more

Commercial operation date: LBNL queue specifies proposed COD of 2028-06-30; CleanView independently confirms 'Expected online 2028' for CAISO-1379, consistent with the LBNL date. The TaiyangNews 'cod_achieved' signal (Aug 2024) is discarded as almost certainly misattributed — the IA was not even executed until Dec 2023 and the project is not listed as operational.

Developer: LBNL lists no developer (null); news extraction from Canary Media (Jan 2026, confidence 0.7) attributes the broader Valley Clean Infrastructure Plan in western Fresno County — where HEARTLAND 1 sits — to Golden State Clean Energy (backed by Westlands Water District). Attribution to this specific 228 MW queue entry is plausible but indirect; no filing-level LLC name is on record.

Status: LBNL confirms IA Executed (2023-12-04) and active queue status; CEQAnet filing corroborates an in-progress environmental review for a Heartland Solar project at matching location and scale in Fresno County.

About

Saved background

Generated Apr 10, 2026 · Predates Oct 24, 2026 queue source

Figures and claims below reflect the saved summary. See the queue record for reported project facts.

The HEARTLAND 1 project is a proposed solar generation project located in Fresno County, California, with a total capacity of 156.04 MW. The project is in the CAISO interconnection queue as entry CAISO-1379, with a queue entry date of May 1, 2017, and a proposed commercial operation date of June 30, 2028. The interconnecting utility is PG&E.

The project's interconnection agreement (IA) was executed on December 4, 2023. The point of interconnection (POI) is Tranquility 230 kV. Recent news coverage has discussed the project in the context of industry developments.

Summary provenance

Summary generated Apr 10, 2026 (UTC).

Source dates used by this summary were not recorded.

Dates in the current asset record

These may postdate the saved summary; they do not establish which inputs it used.

  • CAISO queue source as of: Oct 24, 2026.
Development Risk

Realization risk from now to commercial operation — financing close, EPC and tax-equity counterparty mix, and COD probability vs the proposed date. The diligence view that determines whether the deal actually closes. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Financing close probability
EPC + tax-equity counterparty
Project Details

State

CA

County

Fresno

Grid Region

CAISO (California)

Market

ISO/RTO Member

Developer

—

Utility

PGAE

Entity

CAISO

Service Type

ERIS

Point of Interconnection

Tranquility 230 kV

Data Source

LBNL + Live

DeveloperGolden State Clean Energy±Canary Media · 2026-01-12
Risk Analytics

Composite operating-phase risk view — what this asset's risk profile will look like once it commissions. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Technology
Solar156.04 MW · 68%
Battery72.27 MW · 32%
Generation Forecast

Forward generation outlook — first-year production estimate and 10-year P50 trajectory, with probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

10-year P50 forecast
First-year output estimate
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. First-year DSCR, 10-year cashflow, and counterparty exposure across price and policy scenarios. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

10-year revenue projection
First-year DSCR
Financing close risk
Market Context
Approximate
ISO / RTO
CAISO
Trading Hub
TH_ZP26_GEN-APND
Hub Confidence
LOW

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

Insights & Articles (2)Beta

Last updated 2026-03-26

View all articles