PLUOT (CAISO-1242) — Project Summary

Queue ID
CAISO-1242
Capacity
479 MW
Technology
Solar+Battery
Status
active
Location
Kings, CA
Region
CAISO
Developer
—
IA Status
IA Executed

PLUOT

CAISO-1242BetaActiveSolarBatteryCAISOLBNL + Live

479 MW hybrid in Kings, CA · In queue since May 2016 · Proposed COD January 2027

BA: CISOISO/RTO: CAISONERC: WECCRC: RCW

479 MW

Capacity

2

Components

Solar + Battery

10y 6m

In Queue

IA Executed

IA Phase

Signed Jan 2020

Asset Intelligence Map

One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.

5 live dimensions
4 decision models

Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.

Structured from the current asset record; empty data branches are omitted.Locked nodes are InfraSure decision models; no simulated values shown.
Interconnection

Queue → IA

3y 8m

IA → COD

7 years

Total Duration

3y 8m

Study Phase

C09

Construction75%
Queue EntryMay 2, 2016

Interconnection request submitted to ISO/RTO

Cluster Study (Phase I/II)

CAISO uses cluster studies where projects are batched annually and studied together.

Typical: 36–48 months (IR to IA)

Interconnection AgreementJan 7, 2020

Interconnection agreement executed — binding commitment to build

Typical: 30–60 days (negotiation)

ConstructionCurrent

Active sheet; IA Executed; C09

Project under construction

Typical: 18–30 months

Commercial Operation

Proposed COD: 2027-01-20

Cross-source intelligence

Saved research · Beta
Researched Oct 25, 2026

Experimental assessment saved at the research date. Research and queue COD differ; this comparison does not confirm either date. See the queue record for reported project facts.

Research COD
Jun 30, 2026
Differs from queue: Jan 20, 2027
Developer in saved assessment
—
Status at research time
Active
Active in the CAISO queue with the IA executed 2020-01-07. No public evidence of construction start or financing, and the aggregator-listed June 2026 COD has passed (Infrasure: '4 months past proposed COD'). Aggregators also disagree on size: 479 MW total (254 MW solar + 225 MW BESS) versus 246.4 MW for the solar component.
Financing
Not recorded

Milestones in this assessment

IA executedJan 7, 2020Latest in this assessment

Interconnection Agreement executed for CAISO-1242 PLUOT (PG&E Gates 230 kV POI).

infrasure.ai
Research sources and reasoning (2 recorded sources)

low confidence at research time

  1. infrasure.ai/project/caiso-1242-pluot
  2. cleanview.co/power-projects/planned/battery-storage-projects/california/1242_storage/pluot

Commercial operation date: Infrasure lists "Proposed COD: 2026-06-30" and Cleanview says "expected to come online in June 2026", about 7 months earlier than LBNL's 2027-01-20. Both look like aggregator mirrors of the CAISO queue rather than developer-confirmed targets, and the date has already passed with no sign of construction, so the real COD is probably later.

Developer: The LBNL developer field is null and none of the search results name a developer, owner or parent company. The only relevant hits are queue aggregators.

Status: LBNL shows status 'active' with IA Executed, and the aggregators agree it is active in the queue. Nothing found indicates construction, withdrawal or suspension.

About

Saved background

Generated Apr 10, 2026 · Predates Oct 24, 2026 queue source

Figures and claims below reflect the saved summary. See the queue record for reported project facts.

The PLUOT project is a proposed 479 MW hybrid solar and battery energy storage project located in Kings County, California. The development project consists of a 254 MW solar photovoltaic array coupled with a 225 MW battery energy storage system. The project is interconnected to the PG&E utility via the Gates 230 kV point of interconnection.

The project is listed in the CAISO interconnection queue as entry CAISO-1242, with an initial queue entry date of May 2, 2016. The proposed commercial operation date is June 30, 2026. An Interconnection Agreement (IA) for the project has been executed as of January 7, 2020.

Summary provenance

Summary generated Apr 10, 2026 (UTC).

Source dates used by this summary were not recorded.

Dates in the current asset record

These may postdate the saved summary; they do not establish which inputs it used.

  • CAISO queue source as of: Oct 24, 2026.
Development Risk

Realization risk from now to commercial operation — financing close, EPC and tax-equity counterparty mix, and COD probability vs the proposed date. The diligence view that determines whether the deal actually closes. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Financing close probability
EPC + tax-equity counterparty
Project Details

State

CA

County

Kings

Grid Region

CAISO (California)

Market

ISO/RTO Member

Developer

—

Utility

PGAE

Entity

CAISO

Service Type

NRIS

Point of Interconnection

Gates 230 kV

Data Source

LBNL + Live

Risk Analytics

Composite operating-phase risk view — what this asset's risk profile will look like once it commissions. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Technology
Solar254 MW · 53%
Battery225 MW · 47%
Generation Forecast

Forward generation outlook — first-year production estimate and 10-year P50 trajectory, with probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

10-year P50 forecast
First-year output estimate
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. First-year DSCR, 10-year cashflow, and counterparty exposure across price and policy scenarios. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

10-year revenue projection
First-year DSCR
Financing close risk
Market Context
Approximate
ISO / RTO
CAISO
Trading Hub
TH_ZP26_GEN-APND
Hub Confidence
MEDIUM
Nearest Node (Estimated)
FIFTHS_7_N003
POI Substation
Gates Substation

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No insights available for this project.
InfraSure platform

Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.