AGUA CALIENTE SOLAR 2 (CAISO-1222) — Project Summary

Queue ID
CAISO-1222
Capacity
20 MW
Technology
Solar
Status
active
Location
Maricopa, AZ
Region
CAISO
Developer
IA Status
In Progress (unknown study)

AGUA CALIENTE SOLAR 2

CAISO-1222BetaActiveSolarCAISOLBNL + Live

20 MW generation in Maricopa, AZ · In queue since March 2016 · Proposed COD December 2016

BA: AZPSISO/RTO: CAISONERC: WECCRC: SPPW

20 MW

Capacity

1

Components

Solar

10y 4m

In Queue

In Progress (unknown study)

IA Phase

COD target: 2016

Interconnection

Total Duration

9 months

Schedule

117 months past proposed COD

In Study38%
Queue EntryMar 8, 2016

Interconnection request submitted to ISO/RTO

Cluster Study (Phase I/II)Current

CAISO uses cluster studies where projects are batched annually and studied together.

Typical: 36–48 months (IR to IA)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2016-12-01

About

The AGUA CALIENTE SOLAR 2 project is a proposed 20 MW solar generation project located in Maricopa County, Arizona. The project is in the California Independent System Operator (CAISO) interconnection queue as entry CAISO-1222, with a queue entry date of March 8, 2016. The proposed commercial operation date is December 1, 2016.

The interconnection agreement (IA) status is listed as "In Progress (unknown study)". The project's point of interconnection (POI) is the Hoodoo Wash Switchyard 500 kV, and the interconnecting utility is San Diego Gas & Electric (SDGE). The project has appeared in recent news coverage.

Generated from interconnection queue and public data sources

Development Risk

Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Withdrawal probability vs cohort
IA cluster risk
Project Details

State

AZ

County

Maricopa

Grid Region

CAISO (California)

Market

ISO/RTO Member

Developer

Utility

SDGE

Entity

CAISO

Service Type

ERIS

Point of Interconnection

Hoodoo Wash Switchyard 500 kV

Data Source

LBNL + Live

Risk Analytics

Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Generation Forecast

Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

P50 conditioned on COD
Capacity factor vs cohort
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

Revenue conditioned on COD
Financing close risk
Cohort DSCR comparison
Market Context
Approximate
ISO / RTO
CAISO
Trading Hub
TH_SP15_GEN-APND
Hub Confidence
LOW

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No insights available for this project.

No Ask reports yet for this entity.

Ask about AGUA CALIENTE SOLAR 2
InfraSure platform

Forward forecasts, scenario decomposition, and risk-decision tooling for this queue project.