20 MW
Proposed capacity
active
Current status
Solar
Technology
CAISO
Market / region
2016-12-01
Proposed COD
In Progress (unknown study)
Queue phase
Briefing/projectactive

AGUA CALIENTE SOLAR 2 is a 20 MW Solar project in Arizona, currently active.

The reported queue phase is In Progress (unknown study). Proposed COD is 2016-12-01.

Queue ID
CAISO-1222
Location
Maricopa, Arizona
Technology
Solar
Market / region
CAISO
Point of interconnection
Hoodoo Wash Switchyard 500 kV

What stands out

1

AGUA CALIENTE SOLAR 2 is a 20 MW Solar project in Arizona with status active.

2

The reported queue phase is In Progress (unknown study); proposed COD is 2016-12-01.

Market and operating context

Queue date
2016-03-08
Proposed COD
2016-12-01
IA status
In Progress (unknown study)
Study phase
In Progress (unknown study)
Service type
ERIS

Why it matters

Queue phase, proposed timing, developer identity, and linked events determine how much of the stated pipeline should be treated as actionable development capacity. The project page and deeper report preserve those fields for further diligence.

AGUA CALIENTE SOLAR 2 — verified asset snapshot

FieldValue
Queue IDCAISO-1222
LocationMaricopa, Arizona
TechnologySolar
Market / regionCAISO
Point of interconnectionHoodoo Wash Switchyard 500 kV
Queue date2016-03-08
Proposed COD2016-12-01
IA statusIn Progress (unknown study)