AGUA CALIENTE SOLAR 2 is a 20 MW Solar project in Arizona, currently active.
The reported queue phase is In Progress (unknown study). Proposed COD is 2016-12-01.
- Queue ID
- CAISO-1222
- Location
- Maricopa, Arizona
- Technology
- Solar
- Market / region
- CAISO
- Point of interconnection
- Hoodoo Wash Switchyard 500 kV
What stands out
1
AGUA CALIENTE SOLAR 2 is a 20 MW Solar project in Arizona with status active.
2
The reported queue phase is In Progress (unknown study); proposed COD is 2016-12-01.
Market and operating context
- Queue date
- 2016-03-08
- Proposed COD
- 2016-12-01
- IA status
- In Progress (unknown study)
- Study phase
- In Progress (unknown study)
- Service type
- ERIS