Project BPA-G0744 — Project Summary

Queue ID
BPA-G0744
Capacity
400 MW
Technology
Solar+Battery
Status
active
Location
Grant, WA
Region
West
Developer
IA Status
In Progress (unknown study)

BPA-G0744

BPA-G0744BetaActiveSolarBatteryBPALBNL

400 MW hybrid in Grant, WA · In queue since May 2022 · Proposed COD December 2026

BA: BPATNERC: WECCRC: RCW

400 MW

Capacity

2

Components

Solar + Battery

4y 2m

In Queue

In Progress (unknown study)

IA Phase

COD target: 2026

Interconnection

Total Duration

4y 7m

Study Phase

Transition Cluster

In Study38%
Queue EntryMay 24, 2022

Interconnection request submitted to ISO/RTO

Interconnection StudyCurrent

Project undergoes interconnection studies to assess grid impact.

Typical: 18–36 months

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2026-12-30

About

BPA-G0744 is a proposed 400 MW hybrid Solar+Battery project located in Grant County, Washington. The project consists of 200 MW of solar generation and a 200 MW battery energy storage system. It is listed in the Bonneville Power Administration interconnection queue with an entry date of May 24, 2022, and a proposed commercial operation date of December 30, 2026.

The interconnection agreement status is listed as "In Progress (unknown study)". The point of interconnection is identified as 1. Vantage-Hanford #1 500 kV line 2. Corridor of the 230kV Midway- Rocky Ford and Midway-Potholes 230kV transmission lines.

Generated from interconnection queue and public data sources

Development Risk

Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Withdrawal probability vs cohort
IA cluster risk
Project Details

State

WA

County

Grant

Grid Region

Mountain West

Market

Developer

Utility

Entity

BPA

Service Type

NRIS/ERIS

Point of Interconnection

1. Vantage-Hanford #1 500 kV line 2. Corridor of the 230kV Midway- Rocky Ford and Midway-Potholes 230kV transmission lines

Data Source

LBNL

Risk Analytics

Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Technology
Solar200 MW · 50%
Battery200 MW · 50%
Generation Forecast

Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

P50 conditioned on COD
Capacity factor vs cohort
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

Revenue conditioned on COD
Financing close risk
Cohort DSCR comparison
Market Context
Approximate
ISO / RTO
MOUNTAIN_WEST
Trading Hub
MID-C
Hub Confidence
UNKNOWN

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No insights available for this project.