Search plants, projects, owners, and states
42 MW Hydro operating in Bonner, ID
42 MW
Nameplate Capacity
3
Generators
units
Conventional Hydroelectric
Technology
1955
Operating Since
Coordinates
48.1802, -116.9986
County
Bonner, ID
Forward-looking, asset-specific exposure analytics combining climate hazards, generation variability, and counterparty risk into a single decision-grade view. Powered by InfraRisk.
See the full risk decomposition + scenarios for this asset.
Owner data does not fully agree across sources.
EIA typically reports the operating utility, while GEM resolves to the financial owner or parent corporation. Both can be correct.
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | USACE Northwestern Division | — | United States Army Corps of Engineers |
| Owner(s) | USACE Northwestern Division | — | — |
| Status | Operating | — | — |
Albeni Falls Dam is located on the Pend Oreille River between Oldtown, Idaho, and Priest River, Idaho. It is located on the site of a natural waterfall named Albeni Falls, named after early pioneer Albeni Poirier.
Read more on WikipediaAlbeni Falls is a 42 MW hydroelectric power plant located in Bonner County, Idaho. The plant began operating in 1955 and utilizes three generators. Its primary fuel source is water, and the plant employs conventional hydroelectric technology. The owner and operator is the USACE Northwestern Division.
In the most recent year with available data, Albeni Falls generated 179,343 MWh of electricity, achieving a capacity factor of 48.6%. The plant operates within the Bonneville Power Administration balancing authority and the Western Electricity Coordinating Council (WECC) NERC region. Albeni Falls is ranked as the 12th largest power plant in Idaho out of 76 facilities, and ranks 337th nationally out of 1464 plants.
Generated from EIA, GEM, and public data sources
Grid Region
Pacific Northwest
Market
WEIM Participant
NERC Region
WECC — Western Electricity Coordinating Council
Balancing Authority
Bonneville Power Administration (BPAT)
Grid Voltage
115.0 kV
Regulatory Status
RE — Regulated
Entity Type
Federal
Sector
Electric Utility
Monthly net generation as reported to EIA-923 — useful for historical context. Confidence varies sharply by fuel type; the band above and the “About this data” button explain the caveats specific to this plant and how InfraSure’s in-house model handles them.
11.1K MWh
Latest Month
179.3K MWh
Annual Generation
48.6%
Capacity Factor
Forward-looking generation outlook with probabilistic ranges across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this asset.
2013
$2,294/kW
Est. Construction Cost
Total estimated cost: $96.4M
Forward revenue, DSCR bands, and refinancing risk projected under price, demand, and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this asset.
This plant's balancing authority participates in CAISO's Western Energy Imbalance Market (WEIM). Direct nodal pricing data is not yet available.
No wholesale contracts disclosed in FERC EQR for this plant.
FERC EQR captures bilateral wholesale energy + capacity contracts ≥$1M/yr filed quarterly by jurisdictional sellers — covers renewable PPAs, thermal energy sales agreements, capacity contracts, and tolling agreements alike. Many plants don't appear: regulated-utility output flows to ratepayers via cost-of-service rather than bilateral contracts; small projects fall below the filing threshold; tax-equity-financed renewables route offtake to investors not utilities; merchant plants sell into ISO clearing markets without bilateral contracts. News-extracted buyer facts (below) may surface contracts disclosed only through announcements.
Last updated 2026-03-26
View all articlesNo Ask reports yet for this entity.
Ask about Albeni FallsForward forecasts, scenario decomposition, and risk-decision tooling for this asset.