Search plants, projects, owners, and states
95.9 MW Wind operating in Benton, WA
95.9 MW
Nameplate Capacity
1
Generators
unit
Onshore Wind Turbine
Technology
2002
Operating Since
Coordinates
46.1003, -119.1110
County
Benton, WA
Nearby Plants
Forward-looking, asset-specific exposure profile combining climate hazards, generation variability, and counterparty risk into a single decision-grade signal.
See the full risk decomposition + scenarios for this asset.
Request a demo →| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Energy Northwest | Energy Northwest | — |
| Owner(s) | Energy Northwest | Energy Northwest | — |
| Status | Operating | operating | — |
GEM identifies the owner as Energy Northwest
This entity is not yet in the GEM ownership database — chain unavailable.
Nine Canyon Wind Project is a 95.9 MW wind power plant located in Benton County, Washington. The facility began operating in 2002 and is owned and operated by Energy Northwest. The plant utilizes a single generator consisting of multiple onshore wind turbines. Specifically, the turbines are Bonus B62 models, each with a 62-meter rotor diameter and a hub height of 60 meters.
In the most recent year of data, Nine Canyon generated 209,258 MWh of electricity, achieving a capacity factor of 24.9%. The plant operates within the Bonneville Power Administration balancing authority and the Western Electricity Coordinating Council (WECC) NERC region. Nine Canyon is ranked as the 19th largest wind farm out of 24 in Washington state, and 769th out of 1424 nationally.
Generated from EIA, GEM, and public data sources
Grid Region
Pacific Northwest
Market
WEIM Participant
NERC Region
WECC — Western Electricity Coordinating Council
Balancing Authority
Bonneville Power Administration (BPAT)
Grid Voltage
115.0 kV
Regulatory Status
RE — Regulated
Entity Type
State
Sector
Electric Utility
16.0K MWh
Latest Month
209.3K MWh
Annual Generation
24.9%
Capacity Factor
2013
$1,895/kW
Est. Construction Cost
Total estimated cost: $181.8M
This plant's balancing authority participates in CAISO's Western Energy Imbalance Market (WEIM). Direct nodal pricing data is not yet available.
Last updated 2026-03-14
View all articlesNo Ask reports yet for this entity.
Ask about Nine Canyon