Query
Nine Canyon
Type
Entity Briefing
Entity
Nine Canyon
State
ME
Summary generated
Oct 17, 2026
First saved
Date not recorded

Briefing on Nine Canyon

Entity Briefing

Summary generated Oct 17, 2026 (UTC).

Source dates used by this summary were not recorded.

96 MW
Capacity
Operating
Current status
2002
Operating since
1
Generators
24.9%
Capacity factor
209 GWh
Annual generation
Briefing/plantOperating

Nine Canyon is a 96 MW Onshore Wind Turbine asset in Washington, currently Operating.

Nine Canyon is reported in Washington since 2002 under Energy Northwest. Available operating and financial measures include 24.9% capacity factor and 209 GWh annual generation; $1895/kW reported CapEx.

Location
Benton, Washington
Technology
Onshore Wind Turbine
Owner / parent
Energy Northwest
Operator
Energy Northwest
Grid
Bonneville Power Administration
Plant ID
7936

What stands out

1

Nine Canyon is a 96 MW Onshore Wind Turbine asset in Washington with status Operating.

2

Latest annual operating measures report 24.9% capacity factor and 209 GWh annual generation.

3

Available financial measures include $1895/kW CapEx.

Market and operating context

Balancing authority
Bonneville Power Administration
NERC region
WECC
State rank
#19 of 24
National rank
#786 of 1,442

Why it matters

For this asset, operating status, generation, ownership, and linked events are the primary facts for performance and asset-level diligence. The exact chart and source-linked records below let the reader test those facts before moving to a deeper report.