Search plants, projects, owners, and states
22.5 MW Natural Gas Fired Combustion Turbine (10 MW) + Natural Gas Steam Turbine (13 MW) out of service in Worth, GA
22.5 MW
Nameplate Capacity
3
Generators
units
Hybrid (2)
Technology
Natural Gas Fired Combustion Turbine + Natural Gas Steam Turbine
1957
Operating Since
Coordinates
31.8447, -83.9407
County
Worth, GA
Nearby Plants
Forward-looking, asset-specific exposure analytics combining climate hazards, generation variability, and counterparty risk into a single decision-grade view. Powered by InfraRisk.
See the full risk decomposition + scenarios for this asset.
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Crisp County Power Comm | — | — |
| Owner(s) | Crisp County Power Comm | — | — |
| Status | Out of service | — | — |
Crisp Plant is a 22.5 MW hybrid power plant located in Worth County, Georgia. The plant, which began operating in 1957, is owned and operated by Crisp County Power Commission. It utilizes both natural gas-fired combustion turbine and natural gas steam turbine technologies. The plant consists of 3 generators and is fueled by natural gas (NG).
Crisp Plant operates within the Southern Company Services, Inc. - Trans balancing authority and the SERC NERC region. In terms of size, it is ranked 29th out of 32 power plants in Georgia and 1287th out of 1963 plants nationally. The plant's latest annual generation was 229 MWh, resulting in a capacity factor of 0.1%.
Generated from EIA, GEM, and public data sources
Grid Region
Southeast
Market
SEEM Participant
NERC Region
SERC — SERC Reliability Corporation
Balancing Authority
Southern Company Services, Inc. - Trans (SOCO)
Grid Voltage
46.0 kV
Regulatory Status
RE — Regulated
Entity Type
Political Subdivision
Sector
Electric Utility
Monthly net generation as reported to EIA-923 — useful for historical context. Confidence varies sharply by fuel type; the band above and the “About this data” button explain the caveats specific to this plant and how InfraSure’s in-house model handles them.
19 MWh
Latest Month
229 MWh
Annual Generation
0.1%
Capacity Factor
Forward-looking generation outlook with probabilistic ranges across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this asset.
CO₂ Intensity
1557 lb/MWh
Low-utilization plant — per-MWh rate is dominated by startup/standby emissions; not directly comparable to baseload averages.
NOx
4 lb/MWh
SO₂
0.043 lb/MWh
CH₄
0.029 lb/MWh
N₂O
0.003 lb/MWh
Capacity Factor
0.4%
Annual Net Gen
1 GWh
CO₂eq
1558 lb/MWh
Subregion
SERC South
2013
$965/kW
Est. Construction Cost
Total estimated cost: $21.7M
Forward revenue, DSCR bands, and refinancing risk projected under price, demand, and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this asset.
This plant's balancing authority participates in the Southeast Energy Exchange Market (SEEM). SEEM is a bilateral exchange — no public nodal pricing.
No wholesale contracts disclosed in FERC EQR for this plant.
FERC EQR captures bilateral wholesale energy + capacity contracts ≥$1M/yr filed quarterly by jurisdictional sellers — covers renewable PPAs, thermal energy sales agreements, capacity contracts, and tolling agreements alike. Many plants don't appear: regulated-utility output flows to ratepayers via cost-of-service rather than bilateral contracts; small projects fall below the filing threshold; tax-equity-financed renewables route offtake to investors not utilities; merchant plants sell into ISO clearing markets without bilateral contracts. News-extracted buyer facts (below) may surface contracts disclosed only through announcements.
Last updated 2026-03-26
View all articlesNo Ask reports yet for this entity.
Ask about Crisp PlantForward forecasts, scenario decomposition, and risk-decision tooling for this asset.