Search plants, projects, owners, and states
22 MW Natural Gas operating in Susquehanna, PA
22 MW
Nameplate Capacity
5
Generators
units
Natural Gas Internal Combustion Engine
Technology
2015
Operating Since
One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.
Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.
Plant reference point
41.6575, -76.0488
Reference point calculated from the selected footprint.
Mapped site outline
Site outline mapped in OpenStreetMap. It is not a surveyed or legal boundary.
County
Susquehanna, PA
Nearby Plants
The starting substation is nearby, but its connection to this plant is unconfirmed.
1 mapped line section connects the two facilities over 0.056 km. At least one endpoint uses a nearby spatial match.
The actual electrical circuit, the official point of interconnection (POI), and the market settlement node require separate evidence.
Source checked 26 Oct 2026. Facility colors and shapes indicate source-reported function, not ownership or a confirmed plant connection.
This release uses a national source capture. Coverage and electrical detail vary by location; missing map data does not mean there is no connection. Lettered substation names are display labels where the source has no name. They do not identify ownership or function.
Source snapshot: 25 Oct 2026.
Reverse views of the same physical route are grouped in the route selector. All source records are retained.
Method: source-node-path-v2 · Release: gcr-73c6ce9c596ada3ec63d5523
Forward-looking, asset-specific exposure analytics combining climate hazards, generation variability, and counterparty risk into a single decision-grade view. Powered by InfraRisk.
See the full risk decomposition + scenarios for this asset.
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Roundtop Energy LLC | — | — |
| Owner(s) | Roundtop Energy LLC | — | — |
| Status | Operating | — | — |
Summary generated Mar 22, 2026 (UTC).
Source dates used by this summary were not recorded.
These may postdate the saved summary; they do not establish which inputs it used.
The Roundtop power plant is a 22 MW natural gas-fired facility located in Susquehanna County, Pennsylvania. The plant began operating in 2015 and consists of 5 natural gas-fueled internal combustion engine generators. Roundtop Energy LLC is the owner and operator of the facility.
Roundtop operates within the PJM Interconnection, LLC balancing authority, which is part of the RFC NERC region. In the most recent year of data, the plant generated 29,906 MWh of electricity, achieving a capacity factor of 15.5%. Roundtop is ranked 50th out of 68 power plants in Pennsylvania and 1296th out of 1963 plants nationally.
ISO/RTO
PJM
Market
ISO/RTO Member
NERC Region
RFC
Balancing Authority
PJM Interconnection, LLC (PJM)
Grid Voltage
34.5 kV
Regulatory Status
NR — Non-Regulated
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
Connection evidence
Mapped route candidate
Monthly net generation as reported to EIA-923 — useful for historical context. Confidence varies sharply by fuel type; the band above and the “About this data” button explain the caveats specific to this plant and how InfraSure’s in-house model handles them.
2.6K MWh
Latest Month
29.9K MWh
Annual Generation
15.5%
Capacity Factor
Forward-looking generation outlook with probabilistic ranges across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this asset.
CO₂ Intensity
1074 lb/MWh
NOx
25 lb/MWh
SO₂
0.029 lb/MWh
CH₄
0.020 lb/MWh
N₂O
0.002 lb/MWh
Capacity Factor
31.3%
Annual Net Gen
60 GWh
CO₂eq
1076 lb/MWh
Subregion
RFC East
2015
$812/kW
Est. Construction Cost
Total estimated cost: $17.9M
Forward revenue, DSCR bands, and refinancing risk projected under price, demand, and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this asset.
Point of Interconnection
Nearest Substation
North Meshoppen Substation · 35 kV
Substation Distance
< 10 km
Operator
Penelec
Coord Source
OSM spatial
Market Position
ISO/RTO Market
PJM
LMP Node
1292915209
Pricing Hub
WESTERN HUB
Node Source
EIA-860 direct report
No wholesale contracts disclosed in FERC EQR for this plant.
FERC EQR captures bilateral wholesale energy + capacity contracts ≥$1M/yr filed quarterly by jurisdictional sellers — covers renewable PPAs, thermal energy sales agreements, capacity contracts, and tolling agreements alike. Many plants don't appear: regulated-utility output flows to ratepayers via cost-of-service rather than bilateral contracts; small projects fall below the filing threshold; tax-equity-financed renewables route offtake to investors not utilities; merchant plants sell into ISO clearing markets without bilateral contracts. News-extracted buyer facts (below) may surface contracts disclosed only through announcements.
No insights linked yet for this plant.
Insights enrichment runs on demand — we have the pipeline, we just haven't fetched coverage for this plant yet. Request a detailed re-run and we'll add it.
Forward forecasts, scenario decomposition, and risk-decision tooling for this asset.