Search plants, projects, owners, and states
17.2 MW Hydro operating in Worth, GA
17.2 MW
Nameplate Capacity
4
Generators
units
Conventional Hydroelectric
Technology
1930
Operating Since
Coordinates
31.8477, -83.9420
County
Worth, GA
Nearby Plants
Forward-looking, asset-specific exposure analytics combining climate hazards, generation variability, and counterparty risk into a single decision-grade view. Powered by InfraRisk.
See the full risk decomposition + scenarios for this asset.
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Crisp County Power Comm | — | — |
| Owner(s) | Crisp County Power Comm | — | — |
| Status | Operating | — | — |
The Lake Blackshear Project is a 17.2 MW hydroelectric power plant located in Worth County, Georgia. It began operating in 1930 and consists of four generators utilizing conventional hydroelectric technology. The plant is owned and operated by Crisp County Power Commission.
In the most recent year of data, the Lake Blackshear Project generated 36,329 MWh of electricity, achieving a capacity factor of 24.0%. The plant's output is delivered within the Southern Company Services, Inc. - Trans balancing authority, which is part of the SERC NERC region. The Lake Blackshear Project ranks as the 18th largest power plant out of 30 in the state of Georgia, and 521st out of 1464 nationally.
Generated from EIA, GEM, and public data sources
Grid Region
Southeast
Market
SEEM Participant
NERC Region
SERC — SERC Reliability Corporation
Balancing Authority
Southern Company Services, Inc. - Trans (SOCO)
Grid Voltage
46.0 kV
Regulatory Status
RE — Regulated
Entity Type
Political Subdivision
Sector
Electric Utility
Monthly net generation as reported to EIA-923 — useful for historical context. Confidence varies sharply by fuel type; the band above and the “About this data” button explain the caveats specific to this plant and how InfraSure’s in-house model handles them.
1.9K MWh
Latest Month
36.3K MWh
Annual Generation
24.0%
Capacity Factor
Forward-looking generation outlook with probabilistic ranges across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this asset.
2013
$2,294/kW
Est. Construction Cost
Total estimated cost: $39.5M
Forward revenue, DSCR bands, and refinancing risk projected under price, demand, and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this asset.
This plant's balancing authority participates in the Southeast Energy Exchange Market (SEEM). SEEM is a bilateral exchange — no public nodal pricing.
No wholesale contracts disclosed in FERC EQR for this plant.
FERC EQR captures bilateral wholesale energy + capacity contracts ≥$1M/yr filed quarterly by jurisdictional sellers — covers renewable PPAs, thermal energy sales agreements, capacity contracts, and tolling agreements alike. Many plants don't appear: regulated-utility output flows to ratepayers via cost-of-service rather than bilateral contracts; small projects fall below the filing threshold; tax-equity-financed renewables route offtake to investors not utilities; merchant plants sell into ISO clearing markets without bilateral contracts. News-extracted buyer facts (below) may surface contracts disclosed only through announcements.
No insights linked yet for this plant.
Insights enrichment runs on demand — we have the pipeline, we just haven't fetched coverage for this plant yet. Request a detailed re-run and we'll add it.
No Ask reports yet for this entity.
Ask about Lake Blackshear ProjectForward forecasts, scenario decomposition, and risk-decision tooling for this asset.