Lake Blackshear Project is a 17 MW Conventional Hydroelectric asset in Georgia, currently Operating.
Lake Blackshear Project is reported in Georgia since 1930 under Crisp County Power Comm. Available operating and financial measures include 24.0% capacity factor and 36 GWh annual generation; $2294/kW reported CapEx.
- Location
- Worth, Georgia
- Technology
- Conventional Hydroelectric
- Owner / parent
- Crisp County Power Comm
- Operator
- Crisp County Power Comm
- Grid
- Southern Company Services, Inc. - Trans
- Plant ID
- 752
What stands out
Lake Blackshear Project is a 17 MW Conventional Hydroelectric asset in Georgia with status Operating.
Latest annual operating measures report 24.0% capacity factor and 36 GWh annual generation.
Available financial measures include $2294/kW CapEx.
Market and operating context
- Balancing authority
- Southern Company Services, Inc. - Trans
- NERC region
- SERC
- State rank
- #18 of 30
- National rank
- #517 of 1,462
Why it matters
For this asset, operating status, generation, ownership, and linked events are the primary facts for performance and asset-level diligence. The exact chart and source-linked records below let the reader test those facts before moving to a deeper report.