Search plants, projects, owners, and states
2.9 MW Hydro operating in Tuolumne, CA
2.9 MW
Nameplate Capacity
1
Generators
unit
Conventional Hydroelectric
Technology
1987
Operating Since
Coordinates
37.8164, -120.3120
County
Tuolumne, CA
Nearby Plants
Forward-looking, asset-specific exposure analytics combining climate hazards, generation variability, and counterparty risk into a single decision-grade view. Powered by InfraRisk.
See the full risk decomposition + scenarios for this asset.
Request a demo →| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | City & County of San Francisco - (CA) | City & County of San Francisco | — |
| Owner(s) | City & County of San Francisco | City & County of San Francisco | — |
| Status | Operating | operating | — |
GEM identifies the owner as City & County of San Francisco
This entity is not yet in the GEM ownership database — chain unavailable.
The Moccasin Low Head Hydro Project is a hydroelectric power plant located in Tuolumne County, California. The plant has a total capacity of 2.9 MW and utilizes a single generator. It commenced operations in 1987 and is owned and operated by the City & County of San Francisco. The plant's primary fuel source is water (WAT), and it employs conventional hydroelectric technology.
The Moccasin Low Head Hydro Project operates within the California Independent System Operator (CAISO) balancing authority and the Western Electricity Coordinating Council (WECC) NERC region. In terms of size, the plant is ranked 203 out of 247 power plants in California and 1101 out of 1464 nationally. The latest annual generation data indicates an output of 4 MWh, resulting in a capacity factor of 0.0%.
Generated from EIA, GEM, and public data sources
ISO/RTO
CAISO
Market
ISO/RTO Member
NERC Region
WECC — Western Electricity Coordinating Council
Balancing Authority
California Independent System Operator (CISO)
Grid Voltage
115.0 kV
Regulatory Status
RE — Regulated
Entity Type
Municipal
Sector
Electric Utility
0 MWh
Latest Month
4 MWh
Annual Generation
0.0%
Capacity Factor
Forward-looking generation outlook with probabilistic ranges across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this asset.
Request a demo →2013
$2,294/kW
Est. Construction Cost
Total estimated cost: $6.7M
Forward revenue, DSCR bands, and refinancing risk projected under price, demand, and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this asset.
Request a demo →Point of Interconnection
Nearest Substation
Moccasin Creek Power House
Substation Distance
< 10 km
Coord Source
OSM spatial
Market Position
ISO/RTO Market
CAISO
LMP Node
INTKEP_2_UNITS-APND
Pricing Hub
TH_NP15_GEN-APND
Location Type
Aggregated Node
Node Source
EIA-860 direct report
No news articles linked yet for this plant.
News enrichment runs on demand — we have the pipeline, we just haven't fetched coverage for this plant yet. Request a detailed re-run and we'll add it.
No Ask reports yet for this entity.
Ask about Moccasin Low Head Hydro ProjectForward forecasts, scenario decomposition, and risk-decision tooling for this asset.
Request a demo