Query
Moccasin Low Head Hydro Project
Type
Entity Briefing
Entity
Moccasin Low Head Hydro Project
Technology
hydro
Generated
2026-10-18T02:46:27.378Z

Briefing on Moccasin Low Head Hydro Project

Entity Briefing
Generated Oct 18, 2026·Dataset freshness not reported
3 MW
Capacity
Operating
Current status
1987
Operating since
1
Generators
0.0%
Capacity factor
0 GWh
Annual generation
Briefing/plantOperating

Moccasin Low Head Hydro Project is a 3 MW Conventional Hydroelectric asset in CAISO (California), currently Operating.

Moccasin Low Head Hydro Project is reported in California since 1987 under City & County of San Francisco - (CA). Available operating and financial measures include 0.0% capacity factor and 0 GWh annual generation; $2294/kW reported CapEx.

Location
Tuolumne, California
Technology
Conventional Hydroelectric
Owner / parent
City & County of San Francisco - (CA)
Operator
City & County of San Francisco - (CA)
Grid
CAISO (California)
Plant ID
751

What stands out

1

Moccasin Low Head Hydro Project is a 3 MW Conventional Hydroelectric asset in California with status Operating.

2

Latest annual operating measures report 0.0% capacity factor and 0 GWh annual generation.

3

Available financial measures include $2294/kW CapEx.

Market and operating context

ISO / market
CAISO (California)
Balancing authority
California Independent System Operator
NERC region
WECC
State rank
#204 of 247
National rank
#1090 of 1,462

Why it matters

For this asset in CAISO (California), operating status, generation, ownership, and linked events are the primary facts for performance and asset-level diligence. The exact chart and source-linked records below let the reader test those facts before moving to a deeper report.