150 MW BESS under construction in Bexar, TX
150 MW
Nameplate Capacity
1
Generators
unit
Batteries
Technology
—
Operating Since
Coordinates
29.3251, -98.3256
County
Bexar, TX
Nearby Plants
Forward-looking, asset-specific exposure analytics combining climate hazards, generation variability, and counterparty risk into a single decision-grade view. Powered by InfraRisk.
See the full risk decomposition + scenarios for this asset.
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Padua 2 | — | — |
| Owner(s) | Padua 2 | — | — |
| Status | Under construction | — | — |
Padua 2 is a 150 MW battery energy storage system located in Bexar County, Texas. The plant, identified by the EIA plant code 68913, is owned and operated by Padua 2. It consists of a single generator utilizing batteries as its energy source, with MWH listed as the primary fuel.
The plant operates within the Electric Reliability Council of Texas (ERCOT) balancing authority, placing it within the Texas Reliability Entity (TRE) NERC region. Padua 2 is ranked as the 159th largest power plant in Texas out of 224, and nationally it is ranked 384th out of 514. Recent news coverage indicates interest in the plant's role in grid operations and related deals.
Generated from EIA, GEM, and public data sources
ISO/RTO
ERCOT
Market
ISO/RTO Member
NERC Region
TRE — Texas Reliability Entity
Balancing Authority
Electric Reliability Council of Texas, Inc. (ERCO)
Grid Voltage
138.0 kV
Regulatory Status
NR — Non-Regulated
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
No generation data available for this plant.
Forward-looking generation outlook with probabilistic ranges across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this asset.
2023
$1,361/kW
Est. Construction Cost
Total estimated cost: $204.2M
Forward revenue, DSCR bands, and refinancing risk projected under price, demand, and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this asset.
Market Position
ISO/RTO Market
ERCOT
LMP Node
RN_PAD3_ESS
Pricing Hub
HB_SOUTH
Location Type
Resource Node
Node Source
Curated node match
No wholesale contracts disclosed in FERC EQR for this plant.
FERC EQR captures bilateral wholesale energy + capacity contracts ≥$1M/yr filed quarterly by jurisdictional sellers — covers renewable PPAs, thermal energy sales agreements, capacity contracts, and tolling agreements alike. Many plants don't appear: regulated-utility output flows to ratepayers via cost-of-service rather than bilateral contracts; small projects fall below the filing threshold; tax-equity-financed renewables route offtake to investors not utilities; merchant plants sell into ISO clearing markets without bilateral contracts. News-extracted buyer facts (below) may surface contracts disclosed only through announcements.
Last updated 2026-03-26
View all 6 articlesNo Ask reports yet for this entity.
Ask about Padua 2Forward forecasts, scenario decomposition, and risk-decision tooling for this asset.