90.5 MW Solar operating in Lamar, TX
90.5 MW
Nameplate Capacity
1
Generators
unit
Solar Photovoltaic
Technology
2025
Operating Since
Coordinates
33.6449, -95.6270
County
Lamar, TX
Nearby Plants
Forward-looking, asset-specific exposure analytics combining climate hazards, generation variability, and counterparty risk into a single decision-grade view. Powered by InfraRisk.
See the full risk decomposition + scenarios for this asset.
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Tyson Nick Solar Project, LLC | Tyson Nick Solar Project LLC | — |
| Owner(s) | CVI Renewables Holdings, LLC. | Tyson Nick Solar Project LLC | — |
| Status | Operating | operating | — |
GEM identifies the owner as Tyson Nick Solar Project LLC
This entity is not yet in the GEM ownership database — chain unavailable.
Tyson Nick is a 90.5 MW solar photovoltaic power plant located in Lamar County, Texas. The plant's primary fuel source is solar energy. It consists of a single generator and utilizes fixed-tilt solar tracking technology. The plant is owned and operated by Tyson Nick Solar Project, LLC.
The plant operates within the Electric Reliability Council of Texas (ERCOT) balancing authority and the TRE NERC region. In terms of size, Tyson Nick ranks as the 195th largest solar plant in Texas out of 298, and 662nd nationally out of 7108.
Generated from EIA, GEM, and public data sources
ISO/RTO
ERCOT
Market
ISO/RTO Member
NERC Region
TRE — Texas Reliability Entity
Balancing Authority
Electric Reliability Council of Texas, Inc. (ERCO)
Grid Voltage
138.0 kV
Regulatory Status
NR — Non-Regulated
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
Monthly net generation as reported to EIA-923 — useful for historical context. Confidence varies sharply by fuel type; the band above and the “About this data” button explain the caveats specific to this plant and how InfraSure’s in-house model handles them.
9.4K MWh
Latest Month
—
Annual Generation
—
Capacity Factor
Forward-looking generation outlook with probabilistic ranges across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this asset.
2023
$1,543/kW
Est. Construction Cost
Total estimated cost: $139.6M
Forward revenue, DSCR bands, and refinancing risk projected under price, demand, and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this asset.
Market Position
ISO/RTO Market
ERCOT
LMP Node
—
Pricing Hub
HB_NORTH
Node Source
Shared substation inference
No wholesale contracts disclosed in FERC EQR for this plant.
FERC EQR captures bilateral wholesale energy + capacity contracts ≥$1M/yr filed quarterly by jurisdictional sellers — covers renewable PPAs, thermal energy sales agreements, capacity contracts, and tolling agreements alike. Many plants don't appear: regulated-utility output flows to ratepayers via cost-of-service rather than bilateral contracts; small projects fall below the filing threshold; tax-equity-financed renewables route offtake to investors not utilities; merchant plants sell into ISO clearing markets without bilateral contracts. News-extracted buyer facts (below) may surface contracts disclosed only through announcements.
No insights linked yet for this plant.
Insights enrichment runs on demand — we have the pipeline, we just haven't fetched coverage for this plant yet. Request a detailed re-run and we'll add it.
No Ask reports yet for this entity.
Ask about Tyson NickForward forecasts, scenario decomposition, and risk-decision tooling for this asset.