Query
Tyson Nick
Type
Entity Briefing
Entity
Tyson Nick
Generated
2026-10-10T13:59:13.782Z

Briefing on Tyson Nick

Entity Briefing
Generated Oct 10, 2026·Dataset freshness not reported
91 MW
Capacity
Operating
Current status
2025
Operating since
1
Generators
Briefing/plantOperating

Tyson Nick is a 91 MW Solar Photovoltaic asset in ERCOT (Texas), currently Operating.

Tyson Nick is reported in Texas since 2025 under Tyson Nick Solar Project, LLC. Available operating and financial measures include $1543/kW reported CapEx.

Location
Lamar, Texas
Technology
Solar Photovoltaic
Owner / parent
Tyson Nick Solar Project, LLC
Operator
Tyson Nick Solar Project, LLC
Grid
ERCOT (Texas)
Plant ID
68856

What stands out

1

Tyson Nick is a 91 MW Solar Photovoltaic asset in Texas with status Operating.

2

Available financial measures include $1543/kW CapEx.

3

1 linked queue projects represent 90 MW of proposed capacity.

4

Latest linked story: “ENGIE to Supply Planet-Friendly Power to AstraZeneca Texas Manufacturing Site” (PR Newswire, 2025-11-12).

Market and operating context

ISO / market
ERCOT (Texas)
Balancing authority
Electric Reliability Council of Texas, Inc.
NERC region
TRE
State rank
#264 of 378
National rank
#922 of 7,971

Why it matters

For this asset in ERCOT (Texas), operating status, generation, ownership, and linked events are the primary facts for performance and asset-level diligence. The exact chart and source-linked records below let the reader test those facts before moving to a deeper report.

Tyson Nick — verified asset snapshot

FieldValue
LocationLamar, Texas
TechnologySolar Photovoltaic
Owner / parentTyson Nick Solar Project, LLC
OperatorTyson Nick Solar Project, LLC
GridERCOT (Texas)
Plant ID68856
ISO / marketERCOT (Texas)
Balancing authorityElectric Reliability Council of Texas, Inc.