Query
Tyson Nick
Type
Entity Briefing
Entity
Tyson Nick
Summary generated
Oct 10, 2026
First saved
Date not recorded

Briefing on Tyson Nick

Entity Briefing

Summary generated Oct 10, 2026 (UTC).

Source dates used by this summary were not recorded.

91 MW
Capacity
Operating
Current status
2025
Operating since
1
Generators
Briefing/plantOperating

Tyson Nick is a 91 MW Solar Photovoltaic asset in ERCOT (Texas), currently Operating.

Tyson Nick is reported in Texas since 2025 under Tyson Nick Solar Project, LLC. Available operating and financial measures include $1543/kW reported CapEx.

Location
Lamar, Texas
Technology
Solar Photovoltaic
Owner / parent
Tyson Nick Solar Project, LLC
Operator
Tyson Nick Solar Project, LLC
Grid
ERCOT (Texas)
Plant ID
68856

What stands out

1

Tyson Nick is a 91 MW Solar Photovoltaic asset in Texas with status Operating.

2

Available financial measures include $1543/kW CapEx.

3

1 linked queue projects represent 90 MW of proposed capacity.

4

Latest linked story: “ENGIE to Supply Planet-Friendly Power to AstraZeneca Texas Manufacturing Site” (PR Newswire, 2025-11-12).

Market and operating context

ISO / market
ERCOT (Texas)
Balancing authority
Electric Reliability Council of Texas, Inc.
NERC region
TRE
State rank
#264 of 378
National rank
#922 of 7,971

Why it matters

For this asset in ERCOT (Texas), operating status, generation, ownership, and linked events are the primary facts for performance and asset-level diligence. The exact chart and source-linked records below let the reader test those facts before moving to a deeper report.

Tyson Nick — verified asset snapshot

FieldValue
LocationLamar, Texas
TechnologySolar Photovoltaic
Owner / parentTyson Nick Solar Project, LLC
OperatorTyson Nick Solar Project, LLC
GridERCOT (Texas)
Plant ID68856
ISO / marketERCOT (Texas)
Balancing authorityElectric Reliability Council of Texas, Inc.