Search plants, projects, owners, and states
136.2 MW Wind planned in Tom Green, TX
136.2 MW
Nameplate Capacity
1
Generators
unit
Onshore Wind Turbine
Technology
Planned: —
Planned Operation
Coordinates
31.1949, -100.2118
County
Tom Green, TX
Nearby Plants
Forward-looking, asset-specific exposure analytics combining climate hazards, generation variability, and counterparty risk into a single decision-grade view. Powered by InfraRisk.
See the full risk decomposition + scenarios for this asset.
Request a demo →Owner data does not fully agree across sources.
EIA typically reports the operating utility, while GEM resolves to the financial owner or parent corporation. Both can be correct.
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Greenalia Wind Power Pioneer Field, LLC | NextEra Energy Inc | — |
| Owner(s) | Greenalia Wind Power Pioneer Field, LLC | NextEra Energy | — |
| Status | Planned | announced | — |
Pioneer Field Wind Power is a 136.2 MW wind power plant located in Tom Green County, Texas. The facility utilizes onshore wind turbine technology and consists of one generator. The primary fuel source is wind (WND). The plant is owned by NextEra Energy and operated by Greenalia Wind Power Pioneer Field, LLC.
Pioneer Field Wind Power operates within the Electric Reliability Council of Texas, Inc. (ERCOT) balancing authority and the TRE NERC region. In terms of size, the plant is ranked 177 out of 200 wind power plants in Texas and 561 out of 734 nationally.
Generated from EIA, GEM, and public data sources
ISO/RTO
ERCOT
Market
ISO/RTO Member
NERC Region
TRE — Texas Reliability Entity
Balancing Authority
Electric Reliability Council of Texas, Inc. (ERCO)
Grid Voltage
138.0 kV
Regulatory Status
NR — Non-Regulated
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
No generation data available for this plant.
Forward-looking generation outlook with probabilistic ranges across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this asset.
Request a demo →2023
$1,468/kW
Est. Construction Cost
Total estimated cost: $199.9M
Forward revenue, DSCR bands, and refinancing risk projected under price, demand, and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this asset.
Request a demo →Market Position
ISO/RTO Market
ERCOT
LMP Node
TREADWEL4A
Pricing Hub
HB_WEST
Node Source
EIA-860 direct report
No news articles linked yet for this plant.
News enrichment runs on demand — we have the pipeline, we just haven't fetched coverage for this plant yet. Request a detailed re-run and we'll add it.
Forward forecasts, scenario decomposition, and risk-decision tooling for this asset.
Request a demo