Search plants, projects, owners, and states
176.1 MW BESS planned in Hunt, TX
176.1 MW
Nameplate Capacity
1
Generators
unit
Batteries
Technology
Planned: —
Planned Operation
Coordinates
33.1797, -95.8092
County
Hunt, TX
Nearby Plants
Forward-looking, asset-specific exposure analytics combining climate hazards, generation variability, and counterparty risk into a single decision-grade view. Powered by InfraRisk.
See the full risk decomposition + scenarios for this asset.
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Belltown Power Texas 2, LLC | — | — |
| Owner(s) | Belltown Power Texas 2, LLC | — | — |
| Status | Planned | — | — |
Mcmurtre Storage is a 176.1 MW battery energy storage system located in Hunt County, Texas. The plant is owned and operated by Belltown Power Texas 2, LLC. The primary fuel source is electricity (MWH), indicating that the facility stores and discharges power rather than generating it directly from a fuel source. The plant consists of a single generator utilizing battery technology.
Mcmurtre Storage operates within the Electric Reliability Council of Texas (ERCOT) balancing authority, which manages the flow of electricity throughout most of the state. ERCOT is part of the Texas Reliability Entity (TRE) within the North American Electric Reliability Corporation (NERC) regional structure. In terms of size, Mcmurtre Storage is ranked as the 142nd largest power plant in Texas out of 224 facilities, and 345th nationally out of 514.
Generated from EIA, GEM, and public data sources
ISO/RTO
ERCOT
Market
ISO/RTO Member
NERC Region
TRE — Texas Reliability Entity
Balancing Authority
Electric Reliability Council of Texas, Inc. (ERCO)
Grid Voltage
138.0 kV
Regulatory Status
NR — Non-Regulated
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
No generation data available for this plant.
Forward-looking generation outlook with probabilistic ranges across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this asset.
2023
$1,361/kW
Est. Construction Cost
Total estimated cost: $239.7M
Forward revenue, DSCR bands, and refinancing risk projected under price, demand, and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this asset.
Market Position
ISO/RTO Market
ERCOT
LMP Node
—
Pricing Hub
HB_NORTH
Node Source
OSM spatial match
No wholesale contracts disclosed in FERC EQR for this plant.
FERC EQR captures bilateral wholesale energy + capacity contracts ≥$1M/yr filed quarterly by jurisdictional sellers — covers renewable PPAs, thermal energy sales agreements, capacity contracts, and tolling agreements alike. Many plants don't appear: regulated-utility output flows to ratepayers via cost-of-service rather than bilateral contracts; small projects fall below the filing threshold; tax-equity-financed renewables route offtake to investors not utilities; merchant plants sell into ISO clearing markets without bilateral contracts. News-extracted buyer facts (below) may surface contracts disclosed only through announcements.
Last updated 2026-03-26
View all articlesNo Ask reports yet for this entity.
Ask about Mcmurtre StorageForward forecasts, scenario decomposition, and risk-decision tooling for this asset.