McMurtre Storage (ERCOT-25INR0371) — Project Summary

Queue ID
ERCOT-25INR0371
Capacity
176.13 MW
Technology
Battery
Status
active
Location
Hunt, TX
Region
ERCOT
Developer
BT McMurtre Storage, LLC
IA Status
Facility Study

McMurtre Storage

ERCOT-25INR0371BetaActiveBatteryERCOTLBNL + Live

176.13 MW storage in Hunt, TX · In queue since March 2023 · Proposed COD December 2027

BA: ERCOISO/RTO: ERCOTNERC: TRERC: ERCOT

176.13 MW

Capacity

1

Components

Battery

3y 8m

In Queue

Facility Study

IA Phase

COD target: 2027

Asset Intelligence Map

One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.

5 live dimensions
4 decision models

Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.

Structured from the current asset record; empty data branches are omitted.Locked nodes are InfraSure decision models; no simulated values shown.
Interconnection

Total Duration

4y 9m

Facilities Study50%
Queue EntryMar 13, 2023

Interconnection request submitted to ISO/RTO

Interconnection StudyCurrent

SS Completed, FIS Completed, IA

ERCOT uses a serial "connect and manage" approach — fastest among major ISOs.

Typical: 18–30 months (fastest major ISO)

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2027-12-31

Queue history
25INR0371 · 39 monthly ERCOT reports, Mar 2023 – Sep 2026

Projected COD moved

3 times

Dec 2025 → Dec 2027

Net change

+24 months

first report to latest

Capacity

178 → 176 MW

changed in the reports

Latest stage

IA signed

in ERCOT's latest report

Projected COD in each reportDue now (report date = COD)Milestone first reported
Screening study startedMar 13, 2023
Facilities study approvedJul 8, 2024
Interconnection agreement signedSep 17, 2025
On ERCOT's inactive listApr 2026 – Jul 2026

Typical ERCOT request: projected COD moved 3 times, net +24 months (median of 2,595 requests whose COD moved). Projected COD is the developer's estimate as reported to ERCOT. Each date links to the ERCOT report it first appeared in. Source: ERCOT Generation Interconnection Status report (GIS, report type 15933).

Cross-source intelligence

Saved research · Beta
Researched Jun 1, 2026

Experimental assessment saved at the research date. Predates the Oct 1, 2026 queue source. See the queue record for reported project facts.

Research COD
2027
From queue filing
Developer in saved assessment
Energy Vault Holdings
Ownership change in saved research
Status at research time
Active
Active — acquired by Energy Vault March 2026, financing secured March 2026, construction expected to advance toward 2027 COD
Financing
Secured
$139M secured March 31, 2026 (lead not specified in available sources)
Ownership history
  1. 2026-03·Belltown Power (BT McMurtre Storage, LLC)→Energy Vault Holdingsbusinesswire.com

Milestones in this assessment

Ownership changeMar 24, 2026

Energy Vault acquired McMurtre BESS project from Belltown Power

businesswire.com
Financing closeMar 31, 2026

$139M financing secured for McMurtre project construction

bizjournals.com
COD targetJun 2027Latest in this assessment

Expected online December 2027 per Cleanview tracking (LBNL shows June 2027)

cleanview.co
Research sources and reasoning (5 recorded sources)

high confidence at research time

  1. mercomcapital.com/energy-vault-acquires-175-mw-battery-energy-storage-project-in-texas/
  2. businesswire.com/news/home/20260324489830/en/Energy-Vault-Announces-Acquisition-of-175-MW-Battery-Energy-Storage-System-Project-in-Texas
  3. renewablesnow.com/news/energy-vault-buys-175-mw350-mwh-mcmurtre-bess-project-in-texas-1291903/
  4. bizjournals.com/dallas/news/2026/03/31/battery-storage-facility-secures-136m-funding.html
  5. cleanview.co/planned-battery-projects/TX/25INR0371/mcmurtre-storage

Commercial operation date: LBNL proposes June 2027 COD. Energy Vault's March 2026 acquisition announcement and $139M financing (March 31, 2026) suggest active development toward this timeline, but no explicit updated COD was published in press releases.

Developer: LBNL filing entity 'BT McMurtre Storage, LLC' was the original developer (likely Belltown Power based on Business Wire mention of acquisition 'from Belltown Power'). Energy Vault acquired the project in March 2026 and is now the operating developer.

Status: LBNL status is 'active' at Facility Study stage. Energy Vault's acquisition and immediate $139M financing close (March 31, 2026 per Business Journals) indicate the project transitioned from development to pre-construction phase under new ownership.

About

Saved background

Generated Apr 10, 2026 · Predates Oct 1, 2026 queue source

Figures and claims below reflect the saved summary. See the queue record for reported project facts.

The McMurtre Storage project is a proposed 176.13 MW battery energy storage system in Hunt County, Texas. Developed by BT McMurtre Storage, LLC, the project entered the ERCOT interconnection queue as ERCOT-25INR0371 on March 13, 2023. Its proposed commercial operation date is June 1, 2027, and its interconnection status is currently in the Facility Study phase.

The project is linked to the existing Mcmurtre Storage operating plant (EIA ID 68171). The point of interconnection is the tap 138kV 1819 Commerce South - 1815 Cumby Tap. The project has appeared in recent news coverage.

Summary provenance

Summary generated Apr 10, 2026 (UTC).

Source dates used by this summary were not recorded.

Dates in the current asset record

These may postdate the saved summary; they do not establish which inputs it used.

  • ERCOT queue source as of: Oct 1, 2026.
  • Queue history observations through: Sep 2026.
Development Risk

Realization risk before commercial operation — cluster-study clearance, IA timing, counterparty mix, and withdrawal probability vs cohort. The diligence view that determines whether this project is worth pursuing. Powered by InfraSure's development-stage modeling stack.

Available on the InfraSure platform

See the full development-risk decomposition for this project.

P(COD by stated date)
Withdrawal probability vs cohort
IA cluster risk
Project Details

State

TX

County

Hunt

Grid Region

ERCOT (Texas)

Market

ISO/RTO Member

Developer

BT McMurtre Storage, LLC

Utility

—

Entity

ERCOT

Service Type

—

Point of Interconnection

tap 138kV 1819 Commerce South - 1815 Cumby Tap

Data Source

LBNL + Live

Risk Analytics

Composite operating-phase risk view — what this asset's risk profile would look like once it reaches commercial operation. Climate hazards across its operating life, expected generation variability, and offtake counterparty exposure, decomposed into a single decision-grade score. Powered by InfraRisk.

Available on the InfraSure platform

See the full risk decomposition + scenarios for this project.

Climate hazards (8+)
Generation variability (P10/P50/P90)
Offtake + transmission counterparty
Generation Forecast

Forward generation outlook — what this project would produce assuming it reaches commercial operation. Probabilistic ranges (P10/P50/P90) across weather, demand, and policy scenarios, conditioned on the proposed COD. Powered by InfraSure's generation modeling stack.

Available on the InfraSure platform

See the full forecast + scenario decomposition for this project.

P50 conditioned on COD
Capacity factor vs cohort
Weather + policy scenarios
Financial Forecast

Forward revenue, DSCR projection, and financing-close risk — conditioned on commercial operation. The bankability view that determines whether the deal clears its covenants once online. Powered by InfraSure's asset cashflow stack.

Available on the InfraSure platform

See the full revenue + DSCR projection for this project.

Revenue conditioned on COD
Financing close risk
Cohort DSCR comparison
Market Context
Approximate
ISO / RTO
ERCOT
Trading Hub
HB_NORTH
Hub Confidence
HIGH

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No insights available for this project.
InfraSure platform