3.9 MW Solar operating in Hartford, CT
3.9 MW
Nameplate Capacity
1
Generators
unit
Solar Photovoltaic
Technology
2025
Operating Since
Coordinates
41.9038, -72.6581
County
Hartford, CT
Nearby Plants
Forward-looking, asset-specific exposure analytics combining climate hazards, generation variability, and counterparty risk into a single decision-grade view. Powered by InfraRisk.
See the full risk decomposition + scenarios for this asset.
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Telyon AMZ Windsor LLC | — | — |
| Owner(s) | Telyon AMZ Windsor LLC | — | — |
| Status | Operating | operating | — |
Amazon BDL4 is a solar photovoltaic power plant located in Hartford County, Connecticut. The plant has a total capacity of 3.9 MW and began operating in 2025. It is owned and operated by Telyon AMZ Windsor LLC. The facility utilizes a single generator and employs fixed-tilt solar tracking technology.
The plant's primary fuel source is solar energy. Amazon BDL4 operates within the ISO New England Inc. balancing authority and the Northeast Power Coordinating Council (NPCC) NERC region. In terms of size, the plant ranks as the 23rd largest solar facility in Connecticut out of 88, and it holds a national ranking of 3551 out of 7108 solar plants.
Generated from EIA, GEM, and public data sources
ISO/RTO
ISO-NE
Market
ISO/RTO Member
NERC Region
NPCC — Northeast Power Coordinating Council
Balancing Authority
ISO New England Inc. (ISNE)
Grid Voltage
23.0 kV
Regulatory Status
NR — Non-Regulated
Entity Type
Independent Power Producer
Sector
Commercial Non-CHP
No generation data available for this plant.
Forward-looking generation outlook with probabilistic ranges across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this asset.
2023
$2,584/kW
Est. Construction Cost
Total estimated cost: $10.1M
Forward revenue, DSCR bands, and refinancing risk projected under price, demand, and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this asset.
Point of Interconnection
Nearest Substation
Windsor Locks Substation · 115 kV
Substation Distance
3.119 km
Operator
Eversource
Coord Source
OSM spatial
Market Position
ISO/RTO Market
ISO-NE
LMP Node
LD.WNDSRLKS23
Pricing Hub
.Z.CONNECTICUT
Location Type
NETWORK NODE
Node Source
Curated node match
No news articles linked yet for this plant.
News enrichment runs on demand — we have the pipeline, we just haven't fetched coverage for this plant yet. Request a detailed re-run and we'll add it.
Forward forecasts, scenario decomposition, and risk-decision tooling for this asset.