Briefing/plantOperating
Amazon BDL4 is a 4 MW Solar Photovoltaic asset in ISO New England, currently Operating.
Amazon BDL4 is reported in Connecticut since 2025 under Telyon AMZ Windsor LLC. Available operating and financial measures include $2584/kW reported CapEx.
- Location
- Hartford, Connecticut
- Technology
- Solar Photovoltaic
- Owner / parent
- Telyon AMZ Windsor LLC
- Operator
- Telyon AMZ Windsor LLC
- Grid
- ISO New England
- Plant ID
- 68013
What stands out
1
Amazon BDL4 is a 4 MW Solar Photovoltaic asset in Connecticut with status Operating.
2
Available financial measures include $2584/kW CapEx.
Market and operating context
- ISO / market
- ISO New England
- Balancing authority
- ISO New England Inc.
- NERC region
- NPCC
- State rank
- #28 of 98
- National rank
- #4156 of 7,971
Why it matters
For this asset in ISO New England, operating status, generation, ownership, and linked events are the primary facts for performance and asset-level diligence. The exact chart and source-linked records below let the reader test those facts before moving to a deeper report.