300 MW Batteries (150 MW) + Solar Photovoltaic (150 MW) operating in Maricopa, AZ
300 MW
Nameplate Capacity
2
Generators
units
Hybrid (2)
Technology
Batteries + Solar Photovoltaic
2023
Operating Since
Coordinates
33.3239, -112.8397
County
Maricopa, AZ
Nearby Plants
Forward-looking, asset-specific exposure analytics combining climate hazards, generation variability, and counterparty risk into a single decision-grade view. Powered by InfraRisk.
See the full risk decomposition + scenarios for this asset.
Request a demo →| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Arizona Public Service Co | Arizona Public Service Co | — |
| Owner(s) | Arizona Public Service Co | Pinnacle West Capital | — |
| Status | Operating | operating | — |
The Agave plant is a 300 MW hybrid power plant located in Maricopa County, Arizona. It began operating in 2023 and consists of two generators utilizing both battery and solar photovoltaic technologies. The solar component uses single-axis tracking. The plant's primary fuel source is listed as MWH. It is owned by Pinnacle West Capital and operated by Arizona Public Service Company (APS). Agave operates within the Arizona Public Service Company balancing authority and the Western Electricity Coordinating Council (WECC) NERC region.
Agave's latest annual generation was 297,844 MWh, resulting in a capacity factor of 11.3%. The plant's installed cost was $1581.52 per kW. Agave is ranked as the 27th largest power plant in Arizona out of 47, and 162nd nationally out of 514. Financial data for the plant is available from LBNL Solar and FERC.
Generated from EIA, GEM, and public data sources
Grid Region
Mountain West
Market
WEIM Participant
NERC Region
WECC — Western Electricity Coordinating Council
Balancing Authority
Arizona Public Service Company (AZPS)
Grid Voltage
500.0 kV
Regulatory Status
RE — Regulated
Entity Type
Investor-Owned Utility
Sector
Electric Utility
0 MWh
Net Discharge
297.8K MWh
Annual Net Energy
11.3%
Capacity Factor
Positive values indicate net discharge (generation exceeds station load). Negative values indicate net charging. Pure battery storage plants are typically net negative due to round-trip efficiency losses.
Forward-looking generation outlook with probabilistic ranges across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this asset.
Request a demo →Arizona Public Service Company · Data from 2023–2024
$1,582/kW
Installed Cost
$0.0/MWh
Operating Cost
Forward revenue, DSCR bands, and refinancing risk projected under price, demand, and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this asset.
Request a demo →This plant's balancing authority participates in CAISO's Western Energy Imbalance Market (WEIM). Direct nodal pricing data is not yet available.
Last updated 2026-04-19
View all articlesTop solar plant owners in the US
Data tables and metrics from the InfraSure database.
Top solar plant owners in the US
Data tables and metrics from the InfraSure database.
Top 10 solar states
Data tables and metrics from the InfraSure database.
Forward forecasts, scenario decomposition, and risk-decision tooling for this asset.
Request a demo