Search plants, projects, owners, and states
1519 MW Natural Gas Fired Combined Cycle (1127 MW) + Natural Gas Fired Combustion Turbine (392 MW) under construction in Maricopa, AZ
1,519 MW
Nameplate Capacity
14
Generators
units
Hybrid (2)
Technology
Natural Gas Fired Combined Cycle + Natural Gas Fired Combustion Turbine
2002
Operating Since
One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.
Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.
Plant reference point
33.3347, -112.8399
Reference point calculated from the selected footprint.
Mapped site outline
Site outline mapped in OpenStreetMap. It is not a surveyed or legal boundary.
County
Maricopa, AZ
Nearby Plants
The route starts at a transmission substation on the mapped site; its link to the plant’s generation equipment is unconfirmed.
1 mapped line section connects the two facilities over 1.731 km. The line reaches both facility footprints in the source data.
The actual electrical circuit, the official point of interconnection (POI), and the market settlement node require separate evidence.
Source checked 26 Oct 2026. Facility colors and shapes indicate source-reported function, not ownership or a confirmed plant connection.
This release uses a national source capture. Coverage and electrical detail vary by location; missing map data does not mean there is no connection. Lettered substation names are display labels where the source has no name. They do not identify ownership or function.
Source snapshot: 25 Oct 2026.
Reverse views of the same physical route are grouped in the route selector. All source records are retained.
Method: source-node-path-v2 · Release: gcr-73c6ce9c596ada3ec63d5523
Forward-looking, asset-specific exposure analytics combining climate hazards, generation variability, and counterparty risk into a single decision-grade view. Powered by InfraRisk.
See the full risk decomposition + scenarios for this asset.
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Arizona Public Service Co | Arizona Public Service | — |
| Owner(s) | Arizona Public Service Co | Pinnacle West Capital | — |
| Status | Under construction | — | — |
Summary generated Mar 21, 2026 (UTC).
Source dates used by this summary were not recorded.
These may postdate the saved summary; they do not establish which inputs it used.
Red Hawk is a natural gas-fired combined cycle power plant located in Maricopa County, Arizona. The plant has a total capacity of 1127 MW spread across 6 generators. It began operating in 2002 and is owned by Pinnacle West Capital and operated by Arizona Public Service Co (APS). Red Hawk ranks as the 4th largest power plant in Arizona out of 26, and 133rd nationally out of 945 plants.
The plant operates within the Salt River Project balancing authority and the Western Electricity Coordinating Council (WECC) NERC region. In the most recent year of available data, Red Hawk generated 4,842,624 MWh of electricity, achieving a capacity factor of 49.0%.
Grid Region
Mountain West
Market
WEIM Participant
NERC Region
WECC — Western Electricity Coordinating Council
Balancing Authority
Salt River Project (SRP)
Grid Voltage
500.0 kV
Regulatory Status
RE — Regulated
Entity Type
Investor-Owned Utility
Sector
Electric Utility
Connection evidence
Mapped route candidate
Monthly net generation as reported to EIA-923 — useful for historical context. Confidence varies sharply by fuel type; the band above and the “About this data” button explain the caveats specific to this plant and how InfraSure’s in-house model handles them.
231.6K MWh
Latest Month
4.8M MWh
Annual Generation
36.3%
Capacity Factor
Forward-looking generation outlook with probabilistic ranges across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this asset.
CO₂ Intensity
830 lb/MWh
NOx
0.064 lb/MWh
SO₂
0.004 lb/MWh
CH₄
0.016 lb/MWh
N₂O
0.002 lb/MWh
Capacity Factor
44.4%
Annual Net Gen
4431 GWh
CO₂eq
831 lb/MWh
Subregion
WECC Southwest
2013
$965/kW
Est. Construction Cost
Total estimated cost: $1.5B
Forward revenue, DSCR bands, and refinancing risk projected under price, demand, and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this asset.
This plant's balancing authority participates in CAISO's Western Energy Imbalance Market (WEIM). Direct nodal pricing data is not yet available.
No wholesale contracts disclosed in FERC EQR for this plant.
FERC EQR captures bilateral wholesale energy + capacity contracts ≥$1M/yr filed quarterly by jurisdictional sellers — covers renewable PPAs, thermal energy sales agreements, capacity contracts, and tolling agreements alike. Many plants don't appear: regulated-utility output flows to ratepayers via cost-of-service rather than bilateral contracts; small projects fall below the filing threshold; tax-equity-financed renewables route offtake to investors not utilities; merchant plants sell into ISO clearing markets without bilateral contracts. News-extracted buyer facts (below) may surface contracts disclosed only through announcements.
Last updated 2026-05-31
View all articlesForward forecasts, scenario decomposition, and risk-decision tooling for this asset.