Search plants, projects, owners, and states
2 MW Solar operating in Montgomery, MD
2 MW
Nameplate Capacity
1
Generators
unit
Solar Photovoltaic
Technology
2024
Operating Since
Coordinates
39.1937, -77.1187
County
Montgomery, MD
Nearby Plants
Forward-looking, asset-specific exposure analytics combining climate hazards, generation variability, and counterparty risk into a single decision-grade view. Powered by InfraRisk.
See the full risk decomposition + scenarios for this asset.
Request a demo →| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Greenbacker Renewable Energy Corporation | — | — |
| Owner(s) | Greenbacker Renewable Energy Corporation | — | — |
| Status | Operating | operating | — |
Oaks Landfill CS 2 is a 2 MW solar photovoltaic power plant located in Montgomery County, Maryland. The plant began operating in 2024 and is owned and operated by Greenbacker Renewable Energy Corporation. It consists of a single generator utilizing fixed-tilt solar tracking technology. The plant's primary fuel source is solar energy (SUN).
In its most recent year of operation, Oaks Landfill CS 2 generated 2,722 MWh of electricity, achieving a capacity factor of 15.4%. The plant operates within the PJM Interconnection, LLC balancing authority and the RFC NERC region. In terms of size, Oaks Landfill CS 2 ranks as the 113th largest power plant in Maryland out of 183, and 5186th nationally out of 7108.
Generated from EIA, GEM, and public data sources
ISO/RTO
PJM
Market
ISO/RTO Member
NERC Region
RFC
Balancing Authority
PJM Interconnection, LLC (PJM)
Grid Voltage
15.0 kV
Regulatory Status
NR — Non-Regulated
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
195 MWh
Latest Month
2.7K MWh
Annual Generation
15.4%
Capacity Factor
Forward-looking generation outlook with probabilistic ranges across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this asset.
Request a demo →2023
$1,543/kW
Est. Construction Cost
Total estimated cost: $3.1M
Forward revenue, DSCR bands, and refinancing risk projected under price, demand, and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this asset.
Request a demo →Point of Interconnection
Nearest Substation
Mount Zion Substation · 230 kV
Substation Distance
4.953 km
Operator
PEPCO
Coord Source
OSM spatial
Market Position
ISO/RTO Market
PJM
LMP Node
PEPCO MD
Pricing Hub
WESTERN HUB
Alt. Hub / Zone
DOMINION HUB
Location Type
AGGREGATE
Node Source
Curated node match
No news articles linked yet for this plant.
News enrichment runs on demand — we have the pipeline, we just haven't fetched coverage for this plant yet. Request a detailed re-run and we'll add it.
No Ask reports yet for this entity.
Ask about Oaks Landfill CS 2