Oaks Landfill CS 2 is a 2 MW Solar Photovoltaic asset in PJM Interconnection, currently Operating.
Oaks Landfill CS 2 is reported in Maryland since 2024 under Greenbacker Renewable Energy Corporation. Available operating and financial measures include 15.4% capacity factor and 3 GWh annual generation; $1543/kW reported CapEx.
- Location
- Montgomery, Maryland
- Technology
- Solar Photovoltaic
- Owner / parent
- Greenbacker Renewable Energy Corporation
- Operator
- Greenbacker Renewable Energy Corporation
- Grid
- PJM Interconnection
- Plant ID
- 67690
What stands out
Oaks Landfill CS 2 is a 2 MW Solar Photovoltaic asset in Maryland with status Operating.
Latest annual operating measures report 15.4% capacity factor and 3 GWh annual generation.
Available financial measures include $1543/kW CapEx.
Market and operating context
- ISO / market
- PJM Interconnection
- Balancing authority
- PJM Interconnection, LLC
- NERC region
- RFC
- State rank
- #119 of 190
- National rank
- #5433 of 7,971
Why it matters
For this asset in PJM Interconnection, operating status, generation, ownership, and linked events are the primary facts for performance and asset-level diligence. The exact chart and source-linked records below let the reader test those facts before moving to a deeper report.