Search plants, projects, owners, and states
75 MW Batteries (25 MW) + Solar Photovoltaic (50 MW) operating in San Bernardino, CA
75 MW
Nameplate Capacity
2
Generators
units
Hybrid (2)
Technology
Batteries + Solar Photovoltaic
2024
Operating Since
Coordinates
34.6091, -117.4537
County
San Bernardino, CA
Nearby Plants
Forward-looking, asset-specific exposure analytics combining climate hazards, generation variability, and counterparty risk into a single decision-grade view. Powered by InfraRisk.
See the full risk decomposition + scenarios for this asset.
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | AES Clean Energy | AES Clean Energy | — |
| Owner(s) | AES Clean Energy | AES Clean Energy | — |
| Status | Operating | operating | — |
GEM identifies the owner as AES Clean Energy
This entity is not yet in the GEM ownership database — chain unavailable.
Located in San Bernardino County, California, the Baldy Mesa 2_Silver Peak Hybrid plant is a 75 MW hybrid facility consisting of solar photovoltaic generation and battery energy storage. The plant, which began operating in 2024, is owned and operated by AES Clean Energy. It utilizes single-axis trackers for its solar panels and lithium-ion batteries for energy storage. The battery energy storage system (BESS) has a total storage capacity of 100 MWh and a duration of 4 hours.
The plant's primary fuel source is categorized as "MWH," reflecting its hybrid nature. In its latest year of operation, the plant generated 118,745 MWh, achieving a capacity factor of 18.0%. The Baldy Mesa 2_Silver Peak Hybrid plant operates within the California Independent System Operator (CAISO) balancing authority and the Western Electricity Coordinating Council (WECC) NERC region. It is ranked as the 135th largest plant in California out of 300, and nationally it is ranked 553rd out of 1205. Financial data is available for the plant from LBNL Solar, and it has been the subject of two news articles related to deals.
Generated from EIA, GEM, and public data sources
ISO/RTO
CAISO
Market
ISO/RTO Member
NERC Region
WECC — Western Electricity Coordinating Council
Balancing Authority
California Independent System Operator (CISO)
Grid Voltage
115.0 kV
Regulatory Status
NR — Non-Regulated
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
Monthly net generation as reported to EIA-923 — useful for historical context. Confidence varies sharply by fuel type; the band above and the “About this data” button explain the caveats specific to this plant and how InfraSure’s in-house model handles them.
5.2K MWh
Latest Month
118.7K MWh
Annual Generation
18.0%
Capacity Factor
Forward-looking generation outlook with probabilistic ranges across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this asset.
Data from 2024
Forward revenue, DSCR bands, and refinancing risk projected under price, demand, and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this asset.
Point of Interconnection
Nearest Substation
Hamlin Substation · 230 kV
Substation Distance
< 10 km
Operator
AES
Coord Source
OSM spatial
Market Position
ISO/RTO Market
CAISO
LMP Node
ROADWAY_1_N001
Pricing Hub
TH_SP15_GEN-APND
Location Type
Pricing Node
Node Source
EIA-860 direct report
No wholesale contracts disclosed in FERC EQR for this plant.
FERC EQR captures bilateral wholesale energy + capacity contracts ≥$1M/yr filed quarterly by jurisdictional sellers — covers renewable PPAs, thermal energy sales agreements, capacity contracts, and tolling agreements alike. Many plants don't appear: regulated-utility output flows to ratepayers via cost-of-service rather than bilateral contracts; small projects fall below the filing threshold; tax-equity-financed renewables route offtake to investors not utilities; merchant plants sell into ISO clearing markets without bilateral contracts. News-extracted buyer facts (below) may surface contracts disclosed only through announcements.
No insights linked yet for this plant.
Insights enrichment runs on demand — we have the pipeline, we just haven't fetched coverage for this plant yet. Request a detailed re-run and we'll add it.
No Ask reports yet for this entity.
Ask about Baldy Mesa 2_Silver Peak HybridForward forecasts, scenario decomposition, and risk-decision tooling for this asset.