Briefing/plantOperating
Baldy Mesa 2_Silver Peak Hybrid is a 75 MW Batteries asset in CAISO (California), currently Operating.
Baldy Mesa 2_Silver Peak Hybrid is reported in California since 2024 under AES Clean Energy. Available operating and financial measures include 18.0% capacity factor and 119 GWh annual generation.
- Location
- San Bernardino, California
- Technology
- Batteries, Solar Photovoltaic
- Owner / parent
- AES Clean Energy
- Operator
- AES Clean Energy
- Grid
- CAISO (California)
- Plant ID
- 66885
What stands out
1
Baldy Mesa 2_Silver Peak Hybrid is a 75 MW Batteries asset in California with status Operating.
2
Latest annual operating measures report 18.0% capacity factor and 119 GWh annual generation.
Market and operating context
- ISO / market
- CAISO (California)
- Balancing authority
- California Independent System Operator
- NERC region
- WECC
- State rank
- #129 of 992
- National rank
- #1058 of 7,971
Why it matters
For this asset in CAISO (California), operating status, generation, ownership, and linked events are the primary facts for performance and asset-level diligence. The exact chart and source-linked records below let the reader test those facts before moving to a deeper report.