9.9 MW BESS operating in Val Verde, TX
9.9 MW
Nameplate Capacity
1
Generators
unit
Batteries
Technology
2024
Operating Since
Coordinates
29.3767, -100.8485
County
Val Verde, TX
Nearby Plants
Forward-looking, asset-specific exposure analytics combining climate hazards, generation variability, and counterparty risk into a single decision-grade view. Powered by InfraRisk.
See the full risk decomposition + scenarios for this asset.
Request a demo →| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | HEN Infrastructure, L.L.C. | Hunt Energy Network | — |
| Owner(s) | Hunt Energy Network, LLC, John Hancock Funding Company, Manulife Infrastructure II Holdings A, L.P. | Hunt Energy | — |
| Status | Operating | — | — |
Hamilton BESS is a 9.9 MW battery energy storage system located in Val Verde County, Texas. The plant began operating in 2024 and is owned by Hunt Energy. The operator reported to the Energy Information Administration (EIA) is HEN Infrastructure, L.L.C. The facility consists of a single generator utilizing lithium-ion batteries (LIB) and provides 9.9 MWh of energy storage with a duration of 1 hour.
The plant's primary fuel is listed as purchased megawatt-hours (MWH). Hamilton BESS operates within the Electric Reliability Council of Texas (ERCOT) balancing authority, and is within the Texas Reliability Entity (TRE) NERC region. In terms of capacity, the plant is ranked 300 out of 313 power plants in Texas, and 838 out of 1205 nationally.
Generated from EIA, GEM, and public data sources
ISO/RTO
ERCOT
Market
ISO/RTO Member
NERC Region
TRE — Texas Reliability Entity
Balancing Authority
Electric Reliability Council of Texas, Inc. (ERCO)
Grid Voltage
12.47 kV
Regulatory Status
NR — Non-Regulated
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
−30 MWh
Net Charging
-297 MWh
Annual Net Energy
-0.3%
Capacity Factor
Positive values indicate net discharge (generation exceeds station load). Negative values indicate net charging. Pure battery storage plants are typically net negative due to round-trip efficiency losses.
Forward-looking generation outlook with probabilistic ranges across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this asset.
Request a demo →2023
$1,361/kW
Est. Construction Cost
Total estimated cost: $13.5M
Forward revenue, DSCR bands, and refinancing risk projected under price, demand, and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this asset.
Request a demo →Point of Interconnection
Nearest Substation
Hamilton Road Substation · 138 kV
Substation Distance
0 km
Operator
American Electric Power
Coord Source
OSM spatial
Market Position
ISO/RTO Market
ERCOT
LMP Node
HAMI_BESS_RN
Pricing Hub
HB_SOUTH
Alt. Hub / Zone
LZ_SOUTH
Location Type
Resource Node
Node Source
Curated node match
No news articles linked yet for this plant.
News enrichment runs on demand — we have the pipeline, we just haven't fetched coverage for this plant yet. Request a detailed re-run and we'll add it.
No Ask reports yet for this entity.
Ask about Hamilton BESSForward forecasts, scenario decomposition, and risk-decision tooling for this asset.
Request a demo