Query
Hamilton BESS
Type
Entity Briefing
Entity
Hamilton BESS
State
TN
Technology
battery
Generated
2026-10-18T02:51:20.117Z

Briefing on Hamilton BESS

Entity Briefing
Generated Oct 18, 2026·Dataset freshness not reported
10 MW
Capacity
Operating
Current status
2024
Operating since
1
Generators
-0.3%
Capacity factor
-0 GWh
Annual generation
Briefing/plantOperating

Hamilton BESS is a 10 MW Batteries asset in ERCOT (Texas), currently Operating.

Hamilton BESS is reported in Texas since 2024 under Hunt Energy. Available operating and financial measures include -0.3% capacity factor and -0 GWh annual generation; $1361/kW reported CapEx.

Location
Val Verde, Texas
Technology
Batteries
Owner / parent
Hunt Energy
Operator
HEN Infrastructure, L.L.C.
Grid
ERCOT (Texas)
Plant ID
66782

What stands out

1

Hamilton BESS is a 10 MW Batteries asset in Texas with status Operating.

2

Latest annual operating measures report -0.3% capacity factor and -0 GWh annual generation.

3

Available financial measures include $1361/kW CapEx.

4

Latest linked story: “Aypa Power, Hunt Energy Network raise US$573 million for US BESS projects” (Energy-Storage.News, 2024-08-09).

Market and operating context

ISO / market
ERCOT (Texas)
Balancing authority
Electric Reliability Council of Texas, Inc.
NERC region
TRE
State rank
#267 of 344
National rank
#730 of 994

Why it matters

For this asset in ERCOT (Texas), operating status, generation, ownership, and linked events are the primary facts for performance and asset-level diligence. The exact chart and source-linked records below let the reader test those facts before moving to a deeper report.